Fifteen Years of Operation of CECE Experimental Industrial Plant in PNPI
暂无分享,去创建一个
S. Bondarenko | I. Alekseev | O. Fedorchenko | T. Vasyanina | K. Konoplev | E. Arkhipov | V. V. Uborsky
[1] S. Bondarenko,et al. Heavy water purification from tritium by CECE process , 2008 .
[2] S. Bondarenko,et al. Improvement of PNPI Experimental Industrial Plant Based on CECE Process for Heavy Water Detritiation , 2008 .
[3] S. Bondarenko,et al. Development of a Heavy Water Detritiation Plant for PIK Reactor , 2005 .
[4] T. V. Voronina,et al. Heavy water detritiation by combined electrolysis catalytic exchange at the experimental industrial plant , 2003 .
[5] T. V. Voronina,et al. The CECE Experimental Industrial Plant for Reprocessing of Tritiated Water Wastes , 2002 .
[6] T. V. Voronina,et al. Operating experience of the experimental industrial plant for reprocessing of tritiated water wastes , 2001 .
[7] I. Alekseev,et al. Installations for Separation of Hydrogen Isotopes by the Method of Chemical Isotopic Exchange in the “Water - Hydrogen” System , 1995 .