TQM and BPR: lessons for maintenance management
暂无分享,去创建一个
[1] John W. Meyer,et al. Institutionalized Organizations: Formal Structure as Myth and Ceremony , 1977, American Journal of Sociology.
[2] F S Nowlan,et al. RELIABILITY-CENTERED MAINTENANCE , 1978 .
[3] David Bennett,et al. Reliability:its implications in production systems design , 1980 .
[4] R. Yin. Case Study Research: Design and Methods , 1984 .
[5] Mohammad Modarres,et al. Statistical uncertainty analysis in reactor risk estimation , 1985 .
[6] Thomas D. Matteson. Airline experience with reliability-centered maintenance , 1985 .
[7] R. Jaikumar. Postindustrial manufacturing , 1986 .
[8] Jack R. Meredith,et al. Automating the factory: theory versus practice , 1987 .
[9] Eliezer Geisler,et al. The Successful Implementation of Application Software in New Production Systems , 1987 .
[10] Dorothy Leonard-Barton,et al. Implementing Structured Software Methodologies: A Case of Innovation in Process Technology , 1987 .
[11] Avijit Banerjee,et al. A simulation study of some maintenance policies in a group technology shop , 1987 .
[12] Jeffrey K. Pinto,et al. Critical factors in successful project implementation , 1987, IEEE Transactions on Engineering Management.
[13] H. Munro,et al. Measuring commitment to new manufacturing technology: integrating technological push and marketing pull concepts , 1988 .
[14] James F. Cox,et al. A study of JIT implementation and operating problems , 1988 .
[15] Roger G. Schroeder,et al. A Theory of Production Competence , 1989 .
[16] James R. Evans,et al. The management and control of quality , 1989 .
[17] Jayant V. Saraph,et al. An Instrument for Measuring the Critical Factors of Quality Management , 1989 .
[18] Kwasi Amoako-Gyampah,et al. The operations management research agenda: An update , 1989 .
[19] Michael Hammer,et al. Reengineering Work: Don’t Automate, Obliterate , 1990 .
[20] A. Meyer,et al. Lasting Improvements in Manufacturing Performance: In Search of a New Theory , 1990 .
[21] Chris W. Clegg,et al. Advanced manufacturing technology and work design: Towards a theoretical framework , 1990 .
[22] L. Schlesinger,et al. Total quality management and the human resource professional: Applying the baldrige framework to human resources , 1991 .
[23] Frank Safayeni,et al. A behavioral case study of just-in-time implementation , 1991 .
[24] Frank Safayeni,et al. Difficulties of Just‐in‐Time Implementation: A Classification Scheme , 1991 .
[25] Mark A. Vonderembse,et al. The evolution of manufacturing systems: Towards the post-industrial enterprise , 1991 .
[26] David Knights,et al. Corporate Strategy, Organizations, and Subjectivity: A Critique , 1991 .
[27] Anthony M. Smith,et al. Reliability-Centered Maintenance , 1992 .
[28] Russell L. Ackoff,et al. Idealized design: Creative corporate visioning , 1993 .
[29] R. Talwar. Business re-engineering—a strategy-driven approach , 1993 .
[30] B. Clarke,et al. JIT Manufacturing Systems: Use and Application in Australia , 1993 .
[31] David A. Johnston,et al. Manufacturing managers and the adoption of advanced manufacturing technology , 1993 .
[32] Andrzej Huczynski,et al. Management Gurus: What Makes Them and How to Become One , 1993 .
[33] John M. Browning. The Power of Process Redesign: A Roundtable Discussion with John Hagel, Richard Heygate, Rod Laird, and Greg Prang , 1993 .
[34] C. W. Gits. Structuring of maintenance control systems , 1994 .
[35] J. Almaraz,et al. Quality Management and the Process of Change , 1994 .
[36] Keith Grint,et al. Reengineering History: Social Resonances and Business Process Reengineering , 1994 .
[37] J. Heineke,et al. Business Process Reengineering: Improving in New Strategic Directions , 1994 .
[38] Kirk D. Fiedler,et al. Exploring the success of information technology enabled business process reengineering , 1994 .
[39] John Farrell. A Practical guide for implementing reengineering , 1994 .
[40] David Tranfield,et al. Strategies for Managing the TQ Agenda , 1994 .
[41] Barbara A. Spencer,et al. MODELS OF ORGANIZATION AND TOTAL QUALITY MANAGEMENT: A COMPARISON AND CRITICAL EVALUATION , 1994 .
[42] Adrian John Wilkinson,et al. Understanding the Meaning of Participation: Views from the Workplace , 1994 .
[43] S. Sitkin,et al. DISTINGUISHING CONTROL FROM LEARNING IN TOTAL QUALITY MANAGEMENT: A CONTINGENCY PERSPECTIVE , 1994 .
[44] Kelvin F. Cross,et al. Corporate renaissance : the art of reengineering , 1994 .
[45] Malcolm Warner,et al. Taylorism, teams and technology in ‘reengineering’ work‐organization , 1994 .
[46] Noemi M. Paz,et al. Maintenance Scheduling: Issues, Results and Research Needs , 1994 .
[47] A. Tuckman. The Yellow Brick Road: Total Quality Management and the Restructuring of Organizational Culture , 1994 .
[48] Fred Luthans,et al. GOING BEYOND TOTAL QUALITY: THE CHARACTERISTICS, TECHNIQUES, AND MEASURES OF LEARNING ORGANIZATIONS , 1995 .
[49] James M. Wilson. Henry Ford′s just‐in‐time system , 1995 .
[50] Jaideep Motwani,et al. Total quality management in manufacturing , 1995 .
[51] Nabil Tamimi,et al. An empirical investigation of critical TQM factors using exploratory factor analysis , 1995 .
[52] Simon S. K. Lam,et al. Quality management and job satisfaction: an empirical study , 1995 .
[53] Hugh Willmott,et al. The odd couple?: re‐engineering business processes; managing human relations , 1995 .
[54] Tarun Gupta,et al. JIT and TQM: a case for joint implementation , 1995 .
[55] Adrian John Wilkinson,et al. Making Quality Critical: New Perspectives on Organizational Change , 1995 .
[56] J. Moubray. Reliability-centred maintenance , 1995 .
[57] J. Hackman,et al. Total Quality Management: Empirical, Conceptual, and Practical Issues , 1995 .
[58] Donald Davis,et al. A STUDY OF MEASURING THE CRITICAL FACTORS OF QUALITY MANAGEMENT , 1995 .
[59] D. Kehoe,et al. Factors affecting the implementation and success of TQM , 1995 .
[60] Frank J. Barrett,et al. The Central Role of Discourse in Large-Scale Change: A Social Construction Perspective , 1995 .
[61] Roger G. Schroeder,et al. Relationship Between JIT and TQM: Practices and Performance , 1995 .
[62] Abby Ghobadian,et al. Total quality management in SMEs , 1996 .
[63] Zinovy D. Radovilsky,et al. Implementing total quality management , 1996 .
[64] J. Peppard,et al. Broadening visions of business process re-engineering , 1996 .
[65] H. Tsoukas. The firm as a distributed knowledge system : A constructionist approach , 1996 .
[66] Donna B. Stoddard,et al. The Reality of Business Reengineering: Pacific Bell's Centrex Provisioning Process , 1996 .
[67] Graeme Salaman,et al. The Management Guru as Organizational Witchdoctor , 1996 .
[68] Matthew A. Waller,et al. Brainstorming: The common thread in TQM, empowerment, re‐engineering and continuous improvement , 1996 .
[69] Tor Guimaraes,et al. Empirically assessing the impact of BPR on manufacturing firms , 1996 .
[70] L. J. Porter,et al. Identification of the Critical Factors of TQM , 1996 .
[71] Amrik S. Sohal,et al. Generative and case study research in quality management: part I: theoretical considerations , 1996 .
[72] Sanjay L. Ahire,et al. Development and Validation of TQM Implementation Constructs , 1996 .
[73] Christian De Cock,et al. TQM and BPR: Beyond the Beyond Myth , 1997 .
[74] J. Hershauer,et al. TOTAL QUALITY MANAGEMENT IN THE SUPPLY CHAIN : WHAT IS ITS IMPACT ON PERFORMANCE? , 1997 .
[75] Tigineh Mersha,et al. TQM implementation in LDCs: driving and restraining forces , 1997 .
[76] Sarah T. Meegan,et al. Factors influencing a successful transition from ISO 9000 to TQM: The influence of understanding and motivation , 1997 .
[77] C. A. Anderson,et al. A three‐dimensional perspective of total quality management , 1998 .
[78] David R. Upton. Just‐in‐time and performance measurement systems , 1998 .
[79] M. Yasin,et al. A conceptual framework for effective implementation of JIT , 1998 .