Fleet-sizing of multi-load autonomous robots for material supply
暂无分享,去创建一个
[1] H. Pfohl,et al. The Impact of Industry 4.0 on the Supply Chain , 2015 .
[2] Bernd Noche,et al. In-plant milk run decision problems , 2014, 2014 International Conference on Logistics Operations Management.
[3] Kripa Shanker,et al. DETERMINATION OF OPTIMAL AGV FLEET SIZE FOR AN FMS , 1998 .
[4] Alexander Verl,et al. AMADEUS - A robotic multipurpose solution for intralogistics , 2012, ROBOTIK.
[5] Jaejin Jang,et al. Estimation of Part Waiting Time and Fleet Sizing in AGV Systems , 2004 .
[6] Nils Boysen,et al. Jena Research Papers in Business and Economics Optimally Routing and Scheduling Tow Trains for JIT-Supply of Mixed-Model Assembly Lines , 2010 .
[7] Alice Yalaoui,et al. Solving Unidirectional Flow Path Design Problems Using Metaheuristics , 2016 .
[8] John E. Kobza,et al. A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems , 1998 .
[9] Wolfgang Echelmeyer,et al. Fast Deployable Autonomous Systems for Order Picking - How Small and Medium Size Enterprises Can Benefit from the Automation of the Picking Process , 2016, ICINCO.
[10] Willibald A. Günthner,et al. Analysis of Parameters Influencing in-plant Milk Run Design for Production Supply , 2013 .
[11] Oliver Ilic,et al. Analysis of the number of automated guided vehicles required in flexible manufacturing systems , 1994 .
[12] J. Deuse,et al. A Planning Approach for In-plant Milk Run Processes to Optimize Material Provision in Assembly Systems , 2012 .