Human resource strategy in disassembly for remanufacturing
暂无分享,去创建一个
[1] G. Seliger,et al. Innovative Processes and Tools for Disassembly , 2002 .
[2] A. Ryan,et al. Characterising components of liquid crystal displays to facilitate disassembly , 2011 .
[3] Bert Bras,et al. Product, process, and organizational design for remanufacture – an overview of research , 1999 .
[4] Christopher A. Voss,et al. Case research in operations management , 2002 .
[5] Muris Lage Junior,et al. Production planning and control for remanufacturing: literature review and analysis , 2012 .
[6] E. Sundin,et al. Making functional sales environmentally and economically beneficial through product remanufacturing , 2005 .
[7] Ben A. Chaouch,et al. A robust block-chain based tabu search algorithm for the dynamic lot sizing problem with product returns and remanufacturing , 2014 .
[8] Peggy Zwolinski,et al. A tool to implement sustainable end-of-life strategies in the product development phase , 2005 .
[9] Geraldo Ferrer. Yield information and supplier responsiveness in remanufacturing operations , 2003, Eur. J. Oper. Res..
[10] Gregory C. Smith,et al. Disassembly sequence structure graphs: An optimal approach for multiple-target selective disassembly sequence planning , 2012, Adv. Eng. Informatics.
[11] R. W. Grubbström,et al. Planned lead time determination in a make-to-order remanufacturing system , 2007 .
[12] K. Inderfurth. Impact of uncertainties on recovery behavior in a remanufacturing environment , 2005 .
[13] V. Daniel R. Guide,et al. OR FORUM - The Evolution of Closed-Loop Supply Chain Research , 2009, Oper. Res..
[14] V. Guide. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[15] Che-Fu Hsueh. An inventory control model with consideration of remanufacturing and product life cycle , 2011 .
[16] Rajesh Srivastava,et al. Product structure complexity and scheduling of operations in recoverable manufacturing , 1997 .
[17] E. Sundin,et al. Managing the Remanufacturing Organization for an Optimal Product Life Cycle , 2005, 2005 4th International Symposium on Environmentally Conscious Design and Inverse Manufacturing.
[18] George Chryssolouris,et al. Assembly system design and operations for product variety , 2011 .
[19] Guoqing Zhang,et al. Optimal production planning for a multi-product closed loop system with uncertain demand and return , 2011, Comput. Oper. Res..
[20] Geraldo Ferrer,et al. Value of information in remanufacturing complex products , 2004 .
[21] Mei Li,et al. Qualitative case studies in operations management: Trends, research outcomes, and future research implications , 2011 .
[22] Conrad Luttropp,et al. Material hygiene: improving recycling of WEEE demonstrated on dishwashers , 2009 .
[23] Bongju Jeong,et al. Supply planning model for remanufacturing system in reverse logistics environment , 2006, Comput. Ind. Eng..
[24] K. Eisenhardt. Building theories from case study research , 1989, STUDI ORGANIZZATIVI.
[25] E Iakovou,et al. On the optimal design of the disassembly and recovery processes. , 2009, Waste management.
[26] Roberto Poles,et al. System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies , 2013 .
[27] Robert U. Ayres,et al. Eco-efficiency, asset recovery and remanufacturing , 1997 .
[28] Carsten Franke,et al. Remanufacturing of mobile phones—capacity, program and facility adaptation planning , 2006 .
[29] Cheng-Han Wu,et al. Product-design and pricing strategies with remanufacturing , 2012, Eur. J. Oper. Res..