The Future Energy Mix Paradigm: How to Embed Large Amounts of Wind Generation While Preserving the Robustness and Quality of the Power Systems?

The 2001/77/CE Renewable Energies European Directive together with Kyoto Protocol ratification by many countries, supported by some Governments vision and strong objectives on the reduction of external oil dependence, put Europe and other developed economies in the front line to achieve a remarkable wind energy penetration within ten years time. These goals will not be achieved without technical costs and risks, but mainly, without a careful planning and assessment of the power system behaviour with large amounts of wind generation (SRA, 2008; IEAWind, 2008). These days, one of the most relevant difficulties the wind sector faces was caused by this technology own extreme success. The high capacity installed in the last decade introduced a brand new set of power system technological concerns that recently became one of the more referenced subjects among developers, network planners and system operators. These concerns are not anymore a negligible distribution grid integration issue that some years ago the experts tended not to give too much relevance since they were easily solved and even more easily avoided through good design and planning, but this is a real power system operation and planning challenge (Holttinen et al, 2009): will the power systems be capable to cope with the specificities of the wind power production in large quantities (aka “high penetration”) without requiring new wind park models, system operation tools, increased performance of the wind turbines or even a change in the Transmission System Operators (TSOs) conventional mode of operation? The recent concern of the TSOs is very legitimate, since it is their responsibility to design and manage the power system global production and its adjustment to the consumer loads as well as to assure the technical quality of the overall service, both in steady-state and under transient occurrences. The wind power capacity reached such a dimension in some European power systems that obliged the TSOs not to neglect the typical behaviour of these spatially distributed renewable power plants, that being a situation that must be addressed by the wind park developers, the wind manufacturers, the TSO planners and regulators together with the experts in this technology grid integration behaviour.

[1]  Lennart Söder,et al.  Design and operation of power systems with large amounts of wind power , 2009 .

[2]  Michael Milligan,et al.  Design and operation of power systems with large amounts of wind power : Final report, IEA WIND Task 25, Phase one 2006-2008 , 2009 .

[3]  Ola Carlson,et al.  Comparison of an aggregated model of a wind farm consisting of fixed‐speed wind turbines with field measurement , 2008 .

[4]  P. D. Dunn,et al.  Fluctuations in output from wind turbine clusters , 1980 .

[5]  Lueder von Bremen,et al.  Advanced Forecast Systems for the Grid Integration of 25 GW Offshore Wind Power in Germany , 2006 .

[6]  Kjetil Uhlen,et al.  Integrating Wind. Developing Europe’s power market for the large-scale integration of wind power: Executive Summary , 2009 .

[7]  A.I. Estanqueiro,et al.  A Dynamic Wind Generation Model for Power Systems Studies , 2007, IEEE Transactions on Power Systems.

[8]  João Peças Lopes,et al.  Impact of the Use of FACTS to Increase Robustness of Operation in Grids with Large Scale Wind Generation , 2006 .

[9]  S. Watson,et al.  Short-term prediction of local wind conditions , 1994 .

[10]  Hannele Holttinen,et al.  The impact of large scale wind power production on the Nordic electricity system , 2004 .

[11]  S. Gusmeroli,et al.  Strategic research agenda , 2010 .

[12]  Inesc Porto,et al.  PRIMARY FREQUENCY CONTROL PARTICIPATION PROVIDED BY DOUBLY FED INDUCTION WIND GENERATORS , 2005 .

[13]  M. Tsili,et al.  CODE REQUIREMENTS FOR LARGE WIND FARMS : A REVIEW OF TECHNICAL REGULATIONS AND AVAILABLE WIND TURBINE TECHNOLOGIES , 2011 .

[14]  Daniel S. Kirschen,et al.  Estimating the Spinning Reserve Requirements in Systems With Significant Wind Power Generation Penetration , 2009, IEEE Transactions on Power Systems.

[15]  Thomas Ackermann,et al.  Wind Power in Power Systems , 2005 .

[16]  C. Gatzen,et al.  Planning of the grid integration of wind energy in Germany onshore and offshore up to the year 2020 , 2006 .

[17]  Roy Billinton,et al.  Application of Monte Carlo simulation to generating system well-being analysis , 1999 .

[18]  P. Sorensen,et al.  Power Fluctuations From Large Wind Farms , 2007, IEEE Transactions on Power Systems.

[19]  Ana Estanqueiro,et al.  How to prepare a power system for 15% wind energy penetration: the Portuguese case study , 2006 .

[20]  J.A.P. Lopes,et al.  Optimum generation control in wind parks when carrying out system operator requests , 2006, IEEE Transactions on Power Systems.

[21]  Ana Estanqueiro,et al.  Impact of Wind Generation Fluctuations in the Design and Operation of Power Systems , 2008 .

[22]  John Saintcross,et al.  THE EFFECTS OF INTEGRATING WIND POWER ON TRANSMISSION SYSTEM PLANNING, RELIABILITY, AND OPERATIONS , 2004 .