The Transaction Costs Driving Captive Power Generation: Evidence from India

The 2003 Indian Electricity Act incentivizes captive power production through open access in an attempt to harness all sources of generation. Yet, we observe that only some firms self-generate while others do not. In this paper we give a transaction cost explanation for such divergent behavior. Using a primary survey of 107 firms from India, we construct a distinct variable to measure the transaction-specificity of electricity use. The ‘make or buy’ decision is then econometrically tested using probit model. Results are highly responsive to transaction-specificity and the likelihood of captive power generation is positively related to it. At the industrial level, this explains why food and chemical firms are more likely to make their own electricity. Since the burden of poor grid supply is highest on smaller sized and high transaction-specific firms, the grid access policies need to account for firm-level characteristics if government wants to incentivize captive power generation.

[1]  S. Masten,et al.  The Costs of Organization , 1991 .

[2]  S. Masten The Organization of Production: Evidence from the Aerospace Industry , 1984, The Journal of Law and Economics.

[3]  Leena Srivastava,et al.  Cost of unserved power in Karnataka, India , 2006 .

[4]  Priyantha D.C. Wijayatunga,et al.  Assessment of economic impact of electricity supply interruptions in the Sri Lanka industrial sector , 2004 .

[5]  J. Dethier,et al.  Firms Operating Under Infrastructure and Credit Constraints in Developing Countries: The Case of Power Generators , 2010 .

[6]  P. Spiller An Institutional Theory of Public Contracts: Regulatory Implications , 2008 .

[7]  W. Dugger The Economic Institutions of Capitalism , 1987 .

[8]  Karen Fisher-Vanden,et al.  Costly Blackouts? Measuring Productivity and Environmental Effects of Electricity Shortages , 2011 .

[9]  O. Williamson The Theory of the Firm as Governance Structure: From Choice to Contract , 2002 .

[10]  Michel Ghertman,et al.  Regulation, Deregulation and Reregulation: Institutional Perspectives , 2009 .

[11]  Paul L. Joskow,et al.  The Simple Economics of Industrial Cogeneration , 1983 .

[12]  Pravin K. Trivedi,et al.  Microeconometrics Using Stata , 2009 .

[13]  Hafiz A. Pasha,et al.  The economic cost of power outages in the industrial sector of Pakistan , 1989 .

[14]  David E. Dismukes,et al.  Cogeneration and electric power industry restructuring , 1999 .

[15]  Gerald R. Faulhaber,et al.  Cross-Subsidization: Pricing in Public Enterprises , 1975 .

[16]  J. Mcdonald,et al.  Economics of Electricity Self-Generation by Industrial Firms , 1991 .

[17]  O. Williamson Transaction-Cost Economics: The Governance of Contractual Relations , 1979, The Journal of Law and Economics.

[18]  R. Meyer,et al.  Vertical Economies and the Costs of Separating Electricity Supply—A Review of Theoretical and Empirical Literature , 2011 .

[19]  Bart Nooteboom,et al.  Research Note: An Analysis of Specificity in Transaction Cost Economics , 1993 .

[20]  Luai M. Al-Hadhrami,et al.  Captive power generation in Saudi Arabia—Overview and recommendations on policies , 2013 .

[21]  Sumila Gulyani Innovating with Infrastructure: How India's Largest Carmaker Copes with Poor Electricity Supply , 1999 .

[22]  W. S. Hesterly,et al.  The impact of firm-specific assets and the interaction of uncertainty: an examination of make or buy decisions in public and private hospitals , 1998 .

[23]  Kyu Sik Lee,et al.  Why Manufacturing Firms Produce Some Electricity Internally , 1999 .

[24]  J. Luis Guasch,et al.  Granting and Renegotiating Infrastructure Concessions: Doing it Right , 2004 .

[25]  W. Diewert A Note on the Elasticity of Derived Demand in the N-Factor Case , 1971 .

[26]  B. M. Mitchell,et al.  Telecommunications Pricing: Theory and Practice , 1991 .

[27]  S. Bhattacharyya Power sector reform in South Asia: Why slow and limited so far? , 2007 .

[28]  D. Finon Incentives to invest in liberalised electricity industries in the North and South. Differences in the need for suitable institutional arrangements , 2006 .

[29]  Paul R. Kleindorfer,et al.  The Economics of Public Utility Regulation , 1986 .

[30]  Kelli Lynn Joseph,et al.  The politics of power: Electricity reform in India , 2010 .

[31]  D. Victor,et al.  Captive Power Plants: Case Study of Gujarat, India , 2004 .

[32]  B. Klein,et al.  Vertical Integration, Appropriable Rents, and the Competitive Contracting Process , 1978, The Journal of Law and Economics.

[33]  Kapil Thukral,et al.  Non-utility captive generation for power sector planning in India , 1990 .