An Optimization Problem in a Closed-Loop Manufacturing System with Stochastic Variability
暂无分享,去创建一个
[1] Shuguang Liu,et al. Dual sourcing in managing operational and disruption risks in contract manufacturing , 2015 .
[2] Saman Hassanzadeh Amin,et al. A multi-objective facility location model for closed-loop supply chain network under uncertain demand and return , 2013 .
[3] Amy Z. Zeng,et al. Building a mutually beneficial partnership to ensure backup supply , 2015 .
[4] Tao Yang,et al. Risk adjusted multicriteria supplier selection models with applications , 2010 .
[5] Susana Relvas,et al. Design and planning of supply chains with integration of reverse logistics activities under demand uncertainty , 2013, Eur. J. Oper. Res..
[6] Kannan Govindan,et al. Reverse logistics network design and planning utilizing conditional value at risk , 2014, Eur. J. Oper. Res..
[7] Amy Z. Zeng,et al. Single or dual sourcing: decision-making in the presence of supply chain disruption risks , 2009 .
[8] Amy Z. Zeng,et al. How many suppliers are best? A decision-analysis approach , 2004 .
[9] V. Daniel R. Guide,et al. OR FORUM - The Evolution of Closed-Loop Supply Chain Research , 2009, Oper. Res..
[10] Brian Tomlin,et al. On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks , 2006, Manag. Sci..
[11] Amy Z. Zeng,et al. Single versus multiple sourcing in the presence of risks , 2006, J. Oper. Res. Soc..
[12] A. Ruiz-Torres,et al. The optimal number of suppliers considering the costs of individual supplier failures , 2007 .
[13] Ruud H. Teunter,et al. Inventory strategies for systems with fast remanufacturing , 2004, J. Oper. Res. Soc..
[14] Russell E. King,et al. A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing , 2013 .
[15] Gilvan C. Souza. Closed-Loop Supply Chains: A Critical Review, and Future Research , 2013, Decis. Sci..
[16] K. Nakashima *,et al. Optimal control of a remanufacturing system , 2004 .