An Optimization Problem in a Closed-Loop Manufacturing System with Stochastic Variability

Abstract This paper develops a decision-making model in a Closed-Loop Supply Chain (CLSC) consisting of two-recyclers and one remanufacturer. The remanufacturer purchases the repaired parts from the recyclers and produces the products to sell them on the market. The sold products are collected and recovered by the recyclers at the end of product life cycle. Each recycler has the different lead time and costs, as well as supply risk. The market demand and parts supply from recyclers are assumed to be random. We model the CLSC as a Markov decision problem to obtain the optimal production and procurement policy. that minimizes the expected average cost period. We discuss the properties of the optimal policy and show the sensitivity analysis under various scenarios. Moreover, the computation results give us that the minimum expected average cost decreases as the reliability and/or the recovery rates of the CLSC increase. Finally, we provide the decision rules for selecting the recyclers.

[1]  Shuguang Liu,et al.  Dual sourcing in managing operational and disruption risks in contract manufacturing , 2015 .

[2]  Saman Hassanzadeh Amin,et al.  A multi-objective facility location model for closed-loop supply chain network under uncertain demand and return , 2013 .

[3]  Amy Z. Zeng,et al.  Building a mutually beneficial partnership to ensure backup supply , 2015 .

[4]  Tao Yang,et al.  Risk adjusted multicriteria supplier selection models with applications , 2010 .

[5]  Susana Relvas,et al.  Design and planning of supply chains with integration of reverse logistics activities under demand uncertainty , 2013, Eur. J. Oper. Res..

[6]  Kannan Govindan,et al.  Reverse logistics network design and planning utilizing conditional value at risk , 2014, Eur. J. Oper. Res..

[7]  Amy Z. Zeng,et al.  Single or dual sourcing: decision-making in the presence of supply chain disruption risks , 2009 .

[8]  Amy Z. Zeng,et al.  How many suppliers are best? A decision-analysis approach , 2004 .

[9]  V. Daniel R. Guide,et al.  OR FORUM - The Evolution of Closed-Loop Supply Chain Research , 2009, Oper. Res..

[10]  Brian Tomlin,et al.  On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks , 2006, Manag. Sci..

[11]  Amy Z. Zeng,et al.  Single versus multiple sourcing in the presence of risks , 2006, J. Oper. Res. Soc..

[12]  A. Ruiz-Torres,et al.  The optimal number of suppliers considering the costs of individual supplier failures , 2007 .

[13]  Ruud H. Teunter,et al.  Inventory strategies for systems with fast remanufacturing , 2004, J. Oper. Res. Soc..

[14]  Russell E. King,et al.  A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing , 2013 .

[15]  Gilvan C. Souza Closed-Loop Supply Chains: A Critical Review, and Future Research , 2013, Decis. Sci..

[16]  K. Nakashima *,et al.  Optimal control of a remanufacturing system , 2004 .