Research on Cooperative Scheduling at Container Terminal under Uncertainties
暂无分享,去创建一个
Meng Yu | Yun Cai | Zhangye Zhao | Mengting Yu | Yun Cai | Zhangye Zhao
[1] David Serrano,et al. Tools and techniques for conceptual design , 1992 .
[2] Jin Zhihong. Coordinated optimization method for berth and quay crane allocation in container terminal , 2008 .
[3] Yang De-li. Application of mobile Agent in the real-time scheduling at container wharf , 2010 .
[4] Li Wen-feng. Container terminal logistics systems collaborative scheduling based on multi-agent systems , 2011 .
[5] Kemper Lewis,et al. Modeling Interactions in Multidisciplinary Design: A Game Theoretic Approach , 1997 .
[6] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[7] Meng Yu,et al. Study on Scheduling System Based on Multi-Agent of Container Terminal , 2006, 2006 10th International Conference on Computer Supported Cooperative Work in Design.
[8] Yang Zhong-zhen. Integrating scheduling model and hybrid optimization algorithm for container terminals , 2010 .
[9] Daofang Chang,et al. Integrating Berth Allocation and Quay Crane Assignments , 2010 .
[10] Christopher Tong,et al. Artificial Intelligence in Engineering Design , 1992 .
[11] Damminda Alahakoon,et al. Improving the adaptability in automated vessel scheduling in container ports using intelligent software agents , 2007, Eur. J. Oper. Res..