Schedule-based pushback design within the stochastic optimisation framework

Abstract The traditional mine planning framework employs a flawed approach in the design of ultimate pit limits and phases. Conventional methods arbitrarily confine the mine’s extraction schedule during the initial stages, detracting from its optimality before it is created. This work aims to provide a method by which a mine’s phase design is created from an optimal extraction schedule. The schedule-based approach to phase design yields implementable mining phases that mimic the initial raw optimal schedule from which it is based. An attempt to minimise the trade-off between mineability and value is inherent to the approach.

[1]  Peter A. Dowd,et al.  Lerchs–Grossmann algorithm with variable slope angles , 2000 .

[2]  R Dimitrakopoulos,et al.  Pushback Design of Open Pit Mines Under Geological and Market Uncertainties , 2010 .

[3]  Éva Tardos,et al.  Algorithm design , 2005 .

[4]  R. Dimitrakopoulos,et al.  Uncertainty-based production scheduling in open pit mining , 2004 .

[5]  Sergei Vassilvitskii,et al.  k-means++: the advantages of careful seeding , 2007, SODA '07.

[6]  Mohammad Waqar Ali Asad,et al.  Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand , 2013, J. Oper. Res. Soc..

[7]  Dorit S. Hochbaum,et al.  Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem , 2000, Oper. Res..

[8]  Roussos Dimitrakopoulos,et al.  Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines , 2013 .

[9]  Salih Ramazan,et al.  Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability , 2004 .

[10]  Roussos Dimitrakopoulos,et al.  Optimising a Mineral Supply Chain Under Uncertainty with Long-Term Sales Contracts , 2018 .

[11]  Roussos Dimitrakopoulos,et al.  A new approach to constrained open pit pushback design using dynamic cut-off grades , 2014, Journal of Mining Science.

[12]  R. Dimitrakopoulos,et al.  Stochastic Optimisation of Mineral Value Chains—Developments and Applications for the Simultaneous Optimisation of Mining Complexes with Uncertainty , 2018 .

[13]  J. Benndorf,et al.  Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty , 2013, Journal of Mining Science.

[14]  Erkan Topal,et al.  Robust, flexible and operational mine design strategies , 2012 .

[15]  Erkan Topal,et al.  A review of soft computing technology applications in several mining problems , 2014, Appl. Soft Comput..

[16]  Roussos Dimitrakopoulos,et al.  Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design , 2002 .

[17]  K. Dagdelen,et al.  Pit Optimization-Strategies for Improving Economics of Mining Projects Through Mine Planning , 2006 .

[18]  Roussos Dimitrakopoulos,et al.  Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons , 2010 .

[19]  Erkan Topal,et al.  Strategic mine planning model using network flow model and real case application , 2012 .

[20]  Gary Froyland,et al.  Blasor—Blended Iron Ore Mine Planning Optimisation at Yandi, Western Australia , 2018 .