Schedule-based pushback design within the stochastic optimisation framework
暂无分享,去创建一个
[1] Peter A. Dowd,et al. Lerchs–Grossmann algorithm with variable slope angles , 2000 .
[2] R Dimitrakopoulos,et al. Pushback Design of Open Pit Mines Under Geological and Market Uncertainties , 2010 .
[3] Éva Tardos,et al. Algorithm design , 2005 .
[4] R. Dimitrakopoulos,et al. Uncertainty-based production scheduling in open pit mining , 2004 .
[5] Sergei Vassilvitskii,et al. k-means++: the advantages of careful seeding , 2007, SODA '07.
[6] Mohammad Waqar Ali Asad,et al. Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand , 2013, J. Oper. Res. Soc..
[7] Dorit S. Hochbaum,et al. Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem , 2000, Oper. Res..
[8] Roussos Dimitrakopoulos,et al. Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines , 2013 .
[9] Salih Ramazan,et al. Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability , 2004 .
[10] Roussos Dimitrakopoulos,et al. Optimising a Mineral Supply Chain Under Uncertainty with Long-Term Sales Contracts , 2018 .
[11] Roussos Dimitrakopoulos,et al. A new approach to constrained open pit pushback design using dynamic cut-off grades , 2014, Journal of Mining Science.
[12] R. Dimitrakopoulos,et al. Stochastic Optimisation of Mineral Value Chains—Developments and Applications for the Simultaneous Optimisation of Mining Complexes with Uncertainty , 2018 .
[13] J. Benndorf,et al. Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty , 2013, Journal of Mining Science.
[14] Erkan Topal,et al. Robust, flexible and operational mine design strategies , 2012 .
[15] Erkan Topal,et al. A review of soft computing technology applications in several mining problems , 2014, Appl. Soft Comput..
[16] Roussos Dimitrakopoulos,et al. Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design , 2002 .
[17] K. Dagdelen,et al. Pit Optimization-Strategies for Improving Economics of Mining Projects Through Mine Planning , 2006 .
[18] Roussos Dimitrakopoulos,et al. Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons , 2010 .
[19] Erkan Topal,et al. Strategic mine planning model using network flow model and real case application , 2012 .
[20] Gary Froyland,et al. Blasor—Blended Iron Ore Mine Planning Optimisation at Yandi, Western Australia , 2018 .