Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming
暂无分享,去创建一个
[1] Jean-Philippe Chancelier,et al. Daily generation scheduling: decomposition methods to solve the hydraulic problems , 1994, 2204.04978.
[2] P. Lautala,et al. A short-term scheduling for a hydropower plant chain , 1998 .
[3] J. Medina,et al. Medium-term hydro-thermal coordination via hydro and thermal subsystem decomposition , 1994 .
[4] Xiaohong Guan,et al. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs , 1999 .
[5] Allen J. Wood,et al. Power Generation, Operation, and Control , 1984 .
[6] O. Nilsson,et al. Mixed-integer programming applied to short-term planning of a hydro-thermal system , 1995 .
[7] Djangir A. Babayev. Piece-wise linear approximation of functions of two variables , 1997, J. Heuristics.