Setting due dates in a stochastic single machine environment

A set of n jobs with statistically independent random processing times has to be processed on a single machine without idling between jobs and without preemption. It is required to set due dates and promise them to customers. During the production stage, earliness and tardiness against the promised due dates will be penalized. The goal is to minimize the total expected penalties. We consider two due date setting procedures with optimum customer service level, and an O(n log n) time complexity. We show that one is asymptotically optimal but the other is not. Both heuristics include safety time and the sequence remains the same regardless of disruptions, so the result is robust. For the normal distribution we provide sufficient optimality conditions, precedence relationships that the optimal sequence must obey, and tight bounds.

[1]  T.C.E. Cheng,et al.  Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine , 1991 .

[2]  Wayne E. Smith Various optimizers for single‐stage production , 1956 .

[3]  T.C.E. Cheng,et al.  Survey of scheduling research involving due date determination decisions , 1989 .

[4]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[5]  Dan Trietsch,et al.  Stochastic scheduling with optimal customer service , 2001, J. Oper. Res. Soc..

[6]  Dan Trietsch,et al.  Johnson's problem with stochastic processing times and optimal service level , 2006, Eur. J. Oper. Res..

[7]  Xiaoqiang Cai,et al.  Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties , 1996 .

[8]  Xiaoqiang Cai,et al.  Scheduling stochastic jobs with asymmetric earliness and tardiness penalties , 1997 .

[9]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..

[10]  Gary D. Scudder,et al.  On the Assignment of Optimal Due Dates , 1989 .

[11]  Xiaoqiang Cai,et al.  Probabilistic analysis of an asymptotically optimal solution for the completion time variance problem , 1999 .

[12]  Hossein Soroush,et al.  The stochastic single machine scheduling problem with earliness and tardiness costs , 1994 .

[13]  H. M. Soroush,et al.  Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs , 1999, Eur. J. Oper. Res..

[14]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties , 1989 .