A BIASED-RANDOMIZED SIMHEURISTIC FOR A HYBRID FLOW SHOP WITH STOCHASTIC PROCESSING TIMES IN THE SEMICONDUCTOR INDUSTRY

Compared to other industries, production systems in semiconductor manufacturing have an above-average level of complexity. Developments in recent decades document increasing product diversity, smaller batch sizes

[1]  Yves Le Traon,et al.  Multi-agent deep reinforcement learning based Predictive Maintenance on parallel machines , 2022, Robotics Comput. Integr. Manuf..

[2]  A. Juan,et al.  A Biased-Randomized Discrete-Event Algorithm for the Hybrid Flow Shop Problem with Time Dependencies and Priority Constraints , 2022, Algorithms.

[3]  Peter Buchholz,et al.  Scheduling Algorithms for a Hybrid Flow Shop under Uncertainty , 2020, Algorithms.

[4]  M. K. Marichelvam,et al.  A literature review on hybrid flow shop scheduling , 2020, Int. J. Adv. Oper. Manag..

[5]  Alberto Ferrer,et al.  On the Use of Biased-Randomized Algorithms for Solving Non-Smooth Optimization Problems , 2019, Algorithms.

[6]  Angel A. Juan,et al.  Agri-food supply chains with stochastic demands: A multi-period inventory routing problem with perishable products , 2019, Simul. Model. Pract. Theory.

[7]  Shaya Sheikh,et al.  Flow shop scheduling problems with assembly operations: a review and new trends , 2018, Int. J. Prod. Res..

[8]  Laura Calvet,et al.  A simheuristic algorithm to set up starting times in the stochastic parallel flowshop problem , 2018, Simul. Model. Pract. Theory.

[9]  Meng Wang,et al.  Review and classification of hybrid shop scheduling , 2018, Prod. Eng..

[10]  Laura Calvet,et al.  Waste collection under uncertainty: a simheuristic based on variable neighbourhood search , 2017 .

[11]  Angel A. Juan,et al.  A discrete-event driven metaheuristic for dynamic home service routing with synchronised trip sharing , 2016 .

[12]  Angel A. Juan,et al.  A BRILS metaheuristic for non-smooth flow-shop problems with failure-risk costs , 2016, Expert Syst. Appl..

[13]  Iraj Mahdavi,et al.  Scheduling of multi-component products in a two-stage flexible flow shop , 2015, Appl. Soft Comput..

[14]  Nikolaos V. Sahinidis,et al.  Simulation optimization: a review of algorithms and applications , 2014, 4OR.

[15]  Moacir Godinho Filho,et al.  HYBRID FLOW SHOP SCHEDULING PROBLEMS INVOLVING SETUP CONSIDERATIONS: A LITERATURE REVIEW AND ANALYSIS , 2014 .

[16]  Mostafa Zandieh,et al.  A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems , 2010, J. Intell. Manuf..

[17]  Rubén Ruiz,et al.  The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..

[18]  M. Gholami,et al.  Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns , 2009 .

[19]  Rubén Ruiz,et al.  Modeling realistic hybrid flexible flowshop scheduling problems , 2008, Comput. Oper. Res..

[20]  Shijie Sun,et al.  A Hybrid Two-Stage flowshop Scheduling Problem , 2007, Asia Pac. J. Oper. Res..

[21]  Rasaratnam Logendran,et al.  Sequence-dependent group scheduling problems in flexible flow shops , 2006 .

[22]  Abdelhakim Artiba,et al.  Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints , 2004, Comput. Ind. Eng..

[23]  Thom J. Hodgson,et al.  Scheduling non-similar groups on a flow line: multiple group setups , 2004 .

[24]  Michael Pinedo Scheduling: Theory, Algorithms, and Systems , 1994 .

[25]  Jatinder N. D. Gupta,et al.  Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .

[26]  B. Feng,et al.  LOCAL SEARCH AND TABU SEARCH ALGORITHMS FOR MACHINE SCHEDULING OF A HYBRID FLOW SHOP UNDER UNCERTAINTY , 2020 .

[27]  Tian-Soon Lee,et al.  A review of scheduling problem and resolution methods in flexible flow shop , 2019, International Journal of Industrial Engineering Computations.

[28]  Inyong Ham,et al.  A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .

[29]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .