Cash flow system development framework within integrated project delivery (IPD) using BIM tools
暂无分享,去创建一个
Faris Elghaish | Sepehr Abrishami | Mark Gaterell | M. Reza Hosseini | M. Gaterell | Sepehr Abrishami | M. Hosseini | Faris Elghaish | R. Wise | Soliman Abu Samra | Richard Wise | Soliman Abu Samra
[1] Jack Chin Pang Cheng,et al. A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM) , 2016 .
[2] R. Baumeister,et al. Writing Narrative Literature Reviews , 1997, Review of General Psychology.
[3] Geoff Zeiss,et al. Building Information Modeling , 2021, Wendehorst Bautechnische Zahlentafeln.
[4] Glenn Ballard,et al. ACTIVITY -BASED COSTING AND ITS APPLICATION TO LEAN CONSTRUCTION , 2001 .
[5] Osama Abudayyeh,et al. Cost‐ and Schedule‐Control Integration: Issues and Needs , 1991 .
[6] Sheryl Staub-French,et al. Creating flexible mappings between building information models and cost information , 2014 .
[7] Ashraf Elazouni. Heuristic method for multi‐project finance‐based scheduling , 2009 .
[8] Harris Cooper,et al. Psychological Bulletin: Editorial. , 2003 .
[9] D. Bem. Writing a Review Article for Psychological Bulletin , 1995 .
[10] Trevor Daff,et al. Cost and Management Accounting , 1986 .
[11] B. Gatmiri,et al. A stochastic model of cash flow forecasting considering delays in owners’ payments , 2018 .
[12] Andrew D.F. Price,et al. Net cashflow models: Are they reliable? , 1991 .
[13] Awad S. Hanna,et al. Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems , 2013 .
[14] Hyunjoo Kim,et al. Preparing a Construction Cash Flow Analysis Using Building Information Modeling (BIM) Technology , 2013 .
[15] Karen Gwyn Smith. Implementing Activity-Based Management in Daily Operations , 1996 .
[16] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[17] Mario Vanhoucke,et al. Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting , 2017 .
[18] Kevin T. Stevens,et al. ACTIVITY-BASED COSTING IN IRELAND: BARRIERS TO, AND OPPORTUNITIES FOR, CHANGE , 1999 .
[19] Rosa Remolá í Ferrer,et al. Building information modeling (BIM) , 2014 .
[20] E. W. Davis,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[21] Thomas W. Lin,et al. The Choice of Cost Drivers in Activity-Based Costing: Application at a Chinese Oil Well Cementing Company , 2010 .
[22] Nancy L. Holland,et al. Indirect Cost Categorization and Allocation by Construction Contractors , 1999 .
[23] Yuan Fang,et al. Applying activity‐based costing approach for construction logistics cost analysis , 2011 .
[24] Randall Deutsch,et al. Integrated Project Delivery Overview , 2013 .
[25] Wen-Hsien Tsai,et al. An Activity-Based Costing decision model for life cycle assessment in green building projects , 2014, Eur. J. Oper. Res..
[26] Benedict D. Ilozor,et al. Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual Study , 2012 .
[27] Bea Chiang. Indirect Labor Costs and Implications for Overhead Allocation , 2013 .
[28] Daegu Cho,et al. Database Framework for Cost, Schedule, and Performance Data Integration , 2013 .
[29] Peter E.D. Love,et al. Risk/Reward Compensation Model for Civil Engineering Infrastructure Alliance Projects , 2011 .
[30] O. Moselhi,et al. METHODOLOGY FOR AUTOMATED GENERATION OF 4D BIM , 2015 .
[31] David Arditi,et al. Stochastic Project Financing Analysis System for Construction , 2012 .
[32] Jui-Sheng Chou,et al. Cost simulation in an item-based project involving construction engineering and management , 2011 .
[33] H. Ashcraft. Building Information Modeling : A Framework for Collaboration , 2008 .
[34] Glory Kofi Hoggar,et al. The Stochastic Model , 2018 .
[35] J T Callahan. MANAGING TRANSIT CONSTRUCTION CONTRACT CLAIMS , 1998 .
[36] Taehoon Kim,et al. Activity-Based Costing for Process Improvements , 2016 .
[37] Jae-Jun Kim,et al. Management of Daily Progress in a Construction Project of Multiple Apartment Buildings , 2007 .
[38] Nicholas Walliman,et al. Social research methods , 2006 .
[39] Sungkwon Woo,et al. Flexible Work Breakdown Structure for Integrated Cost and Schedule Control , 2004 .
[40] Daniel W. Halpin,et al. Systems analysis of project cash flow management strategies , 2010 .
[41] P. Cronin,et al. Step-by-step guide to critiquing research. Part 1: quantitative research. , 2007, British journal of nursing.
[42] Dulcy M. Abraham,et al. Portfolio Cash Assessment Using Fuzzy Systems Theory , 2011 .
[43] G. Beekman,et al. Activity Based Costing , 2020, Management Accounting.
[44] Hélène Delerue,et al. National cultural values and the perceived relational risks in biotechnology alliance relationships , 2009 .
[45] T. Das,et al. A risk perception model of alliance structuring , 2001 .
[46] N. Carbonara,et al. Revenue guarantee in public–private partnerships: a win–win model , 2018 .
[47] Daryl J. Bern. Writing a Review Article for Psychological Bulletin , 1995 .
[48] Su-Ling Fan,et al. Integration of Cost and Schedule Using BIM , 2015 .
[49] Wei-Chih Wang,et al. Applying building information modeling to integrate schedule and cost for establishing construction progress curves , 2016 .
[50] Boyd C. Paulson,et al. Information management to integrate cost and schedule for civil engineering projects , 1998 .
[51] John A. Miller. Implementing Activity-Based Management in Daily Operations , 1995 .
[52] Burcin Becerik-Gerber,et al. Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .
[53] Mary E. Zellmer-Bruhn,et al. From the Editors: Experimental designs in international business research , 2016 .