Studying the Interrelationship amongst Various Lean Metrics to Construction Industry Through ISM Methodology

Construction industry is the second largest sector in India. Due to its wide socio economic status, it has been a major area of research as well. Construction industry is known for heavy wastes during production, construction planning, administration etc. Lean is often characterized by minimization of waste. Present paper aims to explore the various lean metrics which helps to reduce wastages in construction thereby improving work quality in the product development process. It further studies the interrelationship amongst them using ISM methodology.

[1]  Chimay J. Anumba,et al.  An integrated business improvement system (IBIS) for construction , 2005 .

[2]  Jennifer B.A. Suttie The Impacts and Effects of Integrated Project Delivery on Participating Organisations With a Focus on Organisational Culture , 2013 .

[3]  Andrew D.F. Price,et al.  Evaluation and analysis of criteria and sub‐criteria of a construction excellence model , 2008 .

[4]  Chang-Sun Chin RFI Responsiveness of Paper-Based vs. Web-Based Information Processing Systems , 2010 .

[5]  S. Vinodh,et al.  Leanness evaluation using IF–THEN rules , 2012 .

[6]  Jiawei Han,et al.  Automatic Construction and Ranking of Topical Keyphrases on Collections of Short Documents , 2014, SDM.

[7]  Paulo Antônio Zawislak,et al.  Value Stream Mapping in Construction: A Case Study in a Brazilian Construction Company , 2005 .

[8]  Margaret Emsley,et al.  The impact of contractors' attributes on construction project success: A post construction evaluation , 2013 .

[9]  Lauri Koskela,et al.  Lean Production in Construction , 1993 .

[10]  S. T. Ng,et al.  Factors contributing to the success of equipment-intensive subcontractors in construction , 2009 .

[11]  David Herranz Limon Measuring Lean Construction - A Performance Measurement model supporting the implementation of Lean practices in the Norwegian construction industry , 2015 .

[12]  S. Vinodh,et al.  Fuzzy logic based leanness assessment and its decision support system , 2011 .

[13]  Albert P.C. Chan,et al.  A computerized model for measuring and benchmarking the partnering performance of construction projects , 2009 .

[14]  Vegard Knotten,et al.  Implementing Virtual Design and Construction (VDC) in Veidekke – Using Simple Metrics to Improve the Design Management Process , 2014 .

[15]  Andrew D.F. Price,et al.  Building a conceptual framework for measuring business performance in construction: an empirical evaluation , 2005 .

[16]  Glenn Ballard,et al.  The Lean Project Delivery System: An Update , 2008 .

[17]  Bjørn Andersen,et al.  Lean Construction Practices and its Effects: A Case Study at St Olav’s Integrated Hospital, Norway , 2012 .

[18]  Olav Torp,et al.  Performance measurement in the building design process: a tool for building design managers , 2013 .

[19]  Shahryar Sorooshian,et al.  LEAN CONSTRUCTION: AN EFFECTIVE APPROACH FOR PROJECT MANAGEMENT , 2015 .

[20]  Zakaria Harun,et al.  Future criteria for success of building projects in Malaysia , 2011 .

[21]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[22]  Albert P.C. Chan,et al.  Key performance indicators for measuring construction success , 2004 .

[23]  Sai On Cheung,et al.  Towards an organizational culture framework in construction , 2011 .

[24]  Hung-da Wan,et al.  A leanness measure of manufacturing systems for quantifying impacts of lean initiatives , 2008 .

[25]  Mladen Radujković,et al.  Application of key performance indicators in South‐Eastern European construction , 2010 .

[26]  Raid Al-Aomar,et al.  A lean construction framework with Six Sigma rating , 2012 .

[27]  C. Anumba,et al.  Business performance measurement practices in construction engineering organisations , 2005 .

[28]  Audrius Banaitis,et al.  Evaluation of critical success factors for construction projects – an empirical study in Lithuania , 2013 .

[29]  Jorge Moreira da Costa,et al.  Performance Assessment of Construction Companies Integrating Key Performance Indicators and Data Envelopment Analysis , 2010 .

[30]  Hendrik Van Landeghem,et al.  CHALLENGES AND SUCCESS FACTORS FOR IMPLEMENTATION OF LEAN MANUFACTURING IN EUROPEAN SMES , 2011 .

[31]  Gregory A. Howell,et al.  An Update on Last Planner , 2003 .

[32]  Peter Simonsson,et al.  Evaluation of a GPS Support System for Fleet Management Control , 2005 .

[33]  Iris D. Tommelein,et al.  A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-order Manufacturers , 2014 .

[34]  John N. Warfield,et al.  Developing Interconnection Matrices in Structural Modeling , 1974, IEEE Trans. Syst. Man Cybern..

[35]  Felix Lee,et al.  Enabling Lean Supply with a Cloud Computing Platform - An Exploratory Case Study , 2013 .

[36]  Raja R. A. Issa,et al.  Management’s Perception of Key Performance Indicators for Construction , 2003 .