Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process
暂无分享,去创建一个
[1] Simaan M. AbouRizk,et al. Development of an object oriented framework for the simulation of earth moving operations , 1997, Proceedings Intelligent Information Systems. IIS'97.
[2] Vineet R. Kamat,et al. Validating Complex Construction Simulation Models Using 3D Visualization , 2003 .
[3] Michel Dekking,et al. A Markov Chain Model for Subsurface Characterization: Theory and Applications , 2001 .
[4] Cliff Schexnayder,et al. Describing a beta probability distribution function for construction simulation , 2005 .
[5] Simaan M. AbouRizk,et al. Modeling Weather-Sensitive Construction Activity Using Simulation , 2011 .
[6] Osama Moselhi,et al. Schedule Assessment and Evaluation , 2012 .
[7] Ming Lu,et al. Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization , 2008 .
[8] Jonathan Jingsheng Shi,et al. ACTIVITY-BASED CONSTRUCTION (ABC) MODELING AND SIMULATION METHOD , 1999 .
[9] Simaan M. AbouRizk,et al. Role of Simulation in Construction Engineering and Management , 2010 .
[10] R. A. Behrens,et al. Incorporating Seismic Attribute Maps in 3D Reservoir Models , 1998 .
[11] Llewellyn Tang,et al. Simulating Construction Duration for Multistory Buildings with Controlling Activities , 2013 .
[12] Xueqing Zhang,et al. Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques , 2008 .
[13] Danny J. Johnson,et al. A spreadsheet method for calculating work completion time probability distributions of paced or linked assembly lines , 2002 .
[14] Photios G. Ioannou. Geologic Prediction Model for Tunneling , 1987 .
[15] Tarek Zayed,et al. A HYBRID FRAMEWORK FOR MODELING CONSTRUCTION OPERATIONS USING DISCRETE EVENT SIMULATION AND SYSTEM DYNAMICS , 2012 .
[16] Ming Lu,et al. HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong , 2003 .
[17] Lingguang Song,et al. Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes , 2004 .
[18] Matthew J. Liberatore,et al. PROJECT MANAGEMENT IN CONSTRUCTION: SOFTWARE USE AND RESEARCH DIRECTIONS , 2001 .
[19] Hong Zhang,et al. Particle swarm optimization-supported simulation for construction operations , 2006 .
[20] Jae-Jun Kim,et al. Method for Calculating Schedule Delay Considering Lost Productivity , 2005 .
[21] Ming Lu,et al. SIMPLIFIED DISCRETE-EVENT SIMULATION APPROACH FOR CONSTRUCTION SIMULATION , 2003 .
[22] E. Wilde. Engineering project control , 1995 .
[23] Clayton V. Deutsch,et al. Hierarchical object-based stochastic modeling of fluvial reservoirs , 1996 .
[24] Yuhong Liu,et al. Improving Sequential Simulation with a Structured Path Guided by Information Content , 2004 .
[25] Simaan M. AbouRizk,et al. Using Simulation to Plan Tunnel Construction , 2013 .
[26] Tao-Ming Cheng,et al. Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation , 2012 .
[27] Photios G. Ioannou,et al. General purpose simulation with Stroboscope , 1994, Proceedings of Winter Simulation Conference.
[28] A. Sivathanu Pillai,et al. Enhanced pert for programme analysis, control and evaluation: pace , 1995 .
[29] Jesus M. de la Garza,et al. Critical Path Method with Multiple Calendars , 2005 .
[30] Julio C. Martinez,et al. Modeling of Simultaneously Continuous and Stochastic Construction Activities for Simulation , 2013 .
[31] David Arditi,et al. Integrated Simulation System for Construction Operation and Project Scheduling , 2010, J. Comput. Civ. Eng..
[32] Ahmet Öztaş,et al. Construction Project Network Evaluation With Correlated Schedule Risk Analysis Model , 2008 .
[33] Zahid A. Khan,et al. Application of Markov chain and entropy analysis to lithologic succession — an example from the early Permian Barakar Formation, Bellampalli coalfield, Andhra Pradesh, India , 2009 .