Errors in the preparation of design documentation in public procurement in Poland

Abstract The system of construction design completion most frequently used in Poland is the traditional one. In this system, the client describes the subject of the order by means of design documentation and technical specifications of construction and commissioning of building works. The article analyses the most frequent errors that appear in design documentation, discusses the reasons for their occurrence and specifies their possible consequences.