Factors in formwork selection: a comparative investigation
暂无分享,去创建一个
[1] Gary David Holt,et al. A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors , 1998 .
[2] Gary David Holt,et al. Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors , 1999 .
[3] Paul. Olomolaiye,et al. Planned construction times and labour utilization — a comparison of UK and French contractors , 1996 .
[4] Gary David Holt,et al. Factors influencing the choice of concrete supply methods , 1997 .
[5] Paul. Olomolaiye,et al. An evaluation of transportation systems for high rise concrete construction , 1996 .
[6] Russell L. Ackoff. A concept of corporate planning , 1969 .
[7] J. R. Illingworth. Temporary Works - Their Role in Construction , 1987 .
[8] David Arditi. Construction Productivity Improvement , 1985 .
[9] Robert N. Mefford,et al. Quality and productivity: the linkage , 1991 .
[10] Robert T. Ratay. Temporary structures in construction operations : proceedings of a session sponsored by the Construction Division of the American Society of Civil Engineers in conjunction with the ASCE Convention in Atlantic City, New Jersey, April 29, 1987 , 1987 .
[11] G. D. Holt,et al. Factors influencing U.K. construction clients' choice of contractor , 1994 .
[12] Richard L. Tucker,et al. Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .