TBM performance estimation using rock mass classifications

Abstract Three tunnels for hydraulic purposes were excavated by tunnel-boring machines (TBM) in mostly hard metamorphic rocks in Northern Italy. A total of 14 km of tunnel was surveyed almost continually, yielding over 700 sets of data featuring rock mass characteristics and TBM performance. The empirical relations between rock mass rating and penetration rate clearly show that TBM performance reaches a maximum in the rock mass rating ( RMR ) range 40–70 while slower penetration is experienced in both too bad and too good rock masses. However, as different rocks gives different penetrations for the same RMR , the use of Bieniawski's classification for predictive purpose is only possible provided one uses a normalized RMR index with reference to the basic factors affecting TBM tunneling. Comparison of actual penetrations with those predicted by the Innaurato and Barton models shows poor agreement, thus highlighting the difficulties involved in TBM performance prediction.

[1]  Neil S. Mancktelow,et al.  The Simplon line: a major displacement zone in the western Lepontine Alps , 1985 .

[2]  A. Boniface,et al.  Tunnel Boring Machine performance in basalts of the Lesotho Formation , 2000 .

[3]  T. Movinkel,et al.  GEOLOGICAL PARAMETERS FOR HARD ROCK TUNNEL BORING , 1986 .

[4]  F Scolari OPEN-FACE BORERS IN ITALIAN ALPS , 1995 .

[5]  Thomas Reinecke,et al.  Very-high-pressure metamorphism and uplift of coesite-bearing metasediments from the Zermatt-Saas zone, Western Alps , 1991 .

[6]  G. West,et al.  Rock abrasiveness testing for tunnelling , 1989 .

[7]  Claudio Oggeri,et al.  "Validation techniques in tunnelling: the complementary approach of modelling, monitoring and excavation performance evaluation". , 2001 .

[8]  H. Wanner,et al.  Tunnelling Machine Performance In Jointed Rock , 1979 .

[9]  A. G. Milnes Structural Reinterpretation of the Classic Simplon Tunnel Section of the Central Alps , 1973 .

[10]  Michael Alber,et al.  Advance rates of hard rock TBMs and their effects on project economics , 2000 .

[11]  G West,et al.  A REVIEW OF ROCK ABRASIVENESS TESTING FOR TUNNELLING , 1981 .

[12]  A. Steck Le massif du Simplon ― Réflexions sur la cinématique des nappes de gneiss , 1987 .

[13]  Daniele Peila,et al.  Prevision of hard rock TBM boring time , 2001 .

[14]  N. Innaurato,et al.  Forecasting And Effective TBM Performances In a Rapid Excavation of a Tunnel In Italy , 1991 .

[15]  A. Bruland,et al.  Tunnelling Performance Estimation Based On Drillability Testing , 1995 .

[16]  R. Reyment,et al.  Statistics and Data Analysis in Geology. , 1988 .

[17]  H. P. Sanio,et al.  Prediction of the performance of disc cutters in anisotropic rock , 1985 .

[18]  Z. Bieniawski Engineering rock mass classifications , 1989 .

[19]  Anthony R. Ingraffea,et al.  TBM performance prediction using rock fracture parameters , 1985 .

[20]  G. Wijk,et al.  The stamp test for rock drillability classification , 1989 .

[21]  Arne Lislerud,et al.  Hard rock tunnel boring: Prognosis and costs , 1988 .

[22]  D. Howarth,et al.  Quantitative assessment of rock texture and correlation with drillability and strength properties , 1987 .

[23]  Nick Barton,et al.  Engineering classification of rock masses for the design of tunnel support , 1974 .

[24]  C. Fairhurst,et al.  The elasto-plastic response of underground excavations in rock masses that satisfy the Hoek-Brown failure criterion , 1999 .

[25]  E. T. Brown,et al.  Underground excavations in rock , 1980 .

[26]  Amund Bruland,et al.  HARD ROCK TUNNEL BORING , 2000 .

[27]  T. Peters,et al.  The Cerchar Abrasivity Index and its relation to rock mineralogy and petrography , 1982 .

[28]  Nick Barton,et al.  TBM Tunnelling in Jointed and Faulted Rock , 2000 .

[29]  John A. Hudson,et al.  Comprehensive rock engineering , 1993 .

[30]  H. M. Hughes,et al.  The relative cuttability of coal-measures stone , 1986 .

[31]  Priscilla P. Nelson,et al.  10 – TBM Performance Analysis with Reference to Rock Properties , 1993 .

[32]  G. Barla,et al.  Tbm Tunnelling In Difficult Ground Conditions , 2000 .