Numerical Modeling for Yield Pillar Design: A Case Study
暂无分享,去创建一个
Syd S. Peng | Ying Xu | Jianbiao Bai | Xiangyu Wang | Wenfeng Li | Xiangyu Wang | J. Bai | Wenfeng Li | S. Peng | Ying Xu
[1] A. A. Campoli,et al. Mitigating destructive longwall bumps through conventional gate entry design. Report of Investigations/1990 , 1990 .
[2] G. Brãuner. Rockbursts in Coal Mines and Their Prevention , 1994 .
[3] Essie Esterhuizen,et al. Numerical Model Calibration for Simulating Coal Pillars , Gob and Overburden Response , 2011 .
[4] Gang Chen. Investigation into yield pillar behavior and design considerations , 1989 .
[5] Christopher Mark,et al. Behavior of simulated longwall gob material , 1993 .
[6] A. H. Salamon,et al. A study of the strength of coal pillars , 1967 .
[7] F. Carr. How to eliminate roof and floor failures with yield pillars , 1984 .
[8] A. A. Campoli. Gob and gate road reaction to longwall mining in bump-prone strata , 1993 .
[9] Wu Yong-zheng. In-situ stress measurements and distribution laws in Lu'an underground coal mines , 2010 .
[10] A. A. Campoli,et al. Coal mine bumps: Five case studies in the eastern United States. Information circular/1987 , 1987 .
[11] Khaled Morsy. Mohamed,et al. Design considerations for longwall yield pillar stability , 2003 .
[12] K. Y. Haramy,et al. Yield pillars for stress control in longwall mines — case study , 1990 .
[13] I. S. Sandler,et al. An algorithm and a modular subroutine for the CAP model , 1979 .