Modeling tradeoffs in three-dimensional concurrent engineering: a goal programming approach

This paper proposes a goal-programming modeling approach to address three-dimensional concurrent engineering (3D-CE) problems involving product, process and supply chain design. The model enables straightforward representation of the interrelations among multiple objectives and analysis of tradeoffs among those that exhibit conflicts. The model is demonstrated through a discussion of integrality versus modularity in product and supply chain designs that is motivated by events that took place in the automotive industry over the last decade. A numerical example is used to illustrate the model and the paper concludes with possible extensions and guidelines for implementation. # 2004 Elsevier B.V. All rights reserved.

[1]  Desmond Doran,et al.  Supply chain implications of modularization , 2003 .

[2]  Kim B. Clark,et al.  Design Rules: The Power of Modularity , 2000 .

[3]  Durward K. Sobek,et al.  The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .

[4]  Stan Schenkerman,et al.  Use and Abuse of Weights in Multiple Objective Decision Support Models , 1991 .

[5]  Steven D. Eppinger,et al.  Special Issue on Design and Development: Sourcing By Design: Product Complexity and the Supply Chain , 2001, Manag. Sci..

[6]  Alexander Schrijver,et al.  Handbook of Critical Issues in Goal Programming , 1992 .

[7]  Panos Y. Papalambros,et al.  Combined maximization of interior comfort and frontal crashworthiness in preliminary vehicle design , 2004 .

[8]  Robert G. Cooper,et al.  Winning at new products : accelerating the process from idea to launch , 2001 .

[9]  Sharon Novak,et al.  Sourcing by design : product architecture and the supply chain , 1999 .

[10]  Arthur C. Sanderson,et al.  AND/OR graph representation of assembly plans , 1986, IEEE Trans. Robotics Autom..

[11]  Durward K. Sobek,et al.  Involving suppliers in product development in the United States and Japan: evidence for set-based concurrent engineering , 1996 .

[12]  Angappa Gunasekaran Concurrent engineering: a competitive strategy for process industries , 1998, J. Oper. Res. Soc..

[13]  G. Don Taylor Design for global manufacturing and assembly , 1997 .

[14]  Chon-Huat Goh,et al.  A Hierarchical System of Performance Measures for Concurrent Engineering , 1997 .

[15]  K. Clark Project scope and project performance: the effect of parts strategy and supplier involvement on product development , 1989 .

[16]  J. H. Dyer How Chrysler Created an American Keiretsu , 1996 .

[17]  Jin Wang,et al.  An optimization model for concurrent selection of tolerances and suppliers , 2001 .

[18]  Daniel Roos,et al.  The machine that changed the world : the story of lean production , 1991 .

[19]  R. V. Hoek Clockspeed: Winning Industry Control in the Age of Temporary Advantage , 2000 .

[20]  M. Fisher What is the Right Supply Chain for Your Product , 1997 .

[21]  Kuang-Hua Chang,et al.  Concurrent Design and Manufacturing for Mechanical Systems , 1999 .

[22]  Teresa Wu,et al.  A Concurrent Engineering Approach to Design for Assembly , 1999 .

[23]  F. Salvadora,et al.  Modularity , product variety , production volume , and component sourcing : theorizing beyond generic prescriptions , 2002 .

[24]  Juliana Hsuan Mikkola,et al.  Managing modularity of product architectures: toward an integrated theory , 2003, IEEE Trans. Engineering Management.

[25]  Mehrdad Tamiz,et al.  Goal programming for decision making: An overview of the current state-of-the-art , 1998, Eur. J. Oper. Res..

[26]  Hokey Min,et al.  On the Origin and Persistence of Misconceptions in Goal Programming , 1991 .

[27]  Andrew Y. C. Nee,et al.  A distributed multi-agent environment for product design and manufacturing planning , 2001 .

[28]  Thomas Y. Choi,et al.  Unveiling the structure of supply networks: case studies in Honda, Acura, and DaimlerChrysler , 2002 .

[29]  Timothy Wayne Cunningham Chains of function delivery : a role for product architecture in concept design , 1998 .

[30]  John Preston,et al.  Winning at New Products , 1988 .

[31]  Juliana Hsuan Mikkola,et al.  Modularity, component outsourcing, and inter‐firm learning , 2003 .

[32]  Walter Eversheim,et al.  Simultaneous engineering approach to an integrated design and process planning , 1997, Eur. J. Oper. Res..

[33]  Saul I. Gass A Process for Determining Priorities and Weights for Large-Scale Linear Goal Programmes , 1986 .

[34]  Tilo Pfeifer,et al.  Concurrent engineering of work and production systems , 1997, Eur. J. Oper. Res..

[35]  Robert P. Smith,et al.  Deciding between Sequential and Concurrent Tasks in Engineering Design , 1998 .