A Research Agenda for Models: To Plan and Schedule Manufacturing Systems
暂无分享,去创建一个
[1] Robin Roundy,et al. A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System , 1986, Math. Oper. Res..
[2] Candace Arai Yano,et al. Buffering against demand uncertainty in material requirements planning systems : systems with no emergency setups , 1985 .
[3] Arthur M. Geoffrion,et al. Scheduling Parallel Production Lines with Changeover Costs: Practical Application of a Quadratic Assignment/LP Approach , 1976, Oper. Res..
[4] Jaikumar Ramchandran,et al. An operational optimization procedure for production scheduling , 1974, Comput. Oper. Res..
[5] Arnoldo C. Hax,et al. Hierarchical integration of production planning and scheduling , 1973 .