A Multi-Criteria Approach for the Evaluation of Low Risk Restoration Projects in Continuous Surface Lignite Mines

The restoration of continuous surface lignite mines entering the closure phase is a long-term, complex and multidisciplinary project. During the evaluation of alternative restoration technologies, various environmental, technical, economic and social parameters are investigated. In this framework, for the selection of the lower risk restoration alternative, the analysis of the associated risks should be incorporated into the decision-making process. This work provides an overview of practical risk management problems and solutions in mining restoration projects. Moreover, it introduces a multi-criteria methodology for the improvement of the decision-making process in the evaluation of restoration alternatives and the selection of the optimal one, considering a continuous surface mining project. The proposed method is a combination of the analytical hierarchy process (AHP) for the quantification of risk factors and the technique for order of preference by similarity to ideal solution (TOPSIS) for the ranking of restoration alternatives based on a low risk approach. The results of the case study indicate that the proposed approach can be utilized as a low cost and easy-to-apply tool, appropriate for coal mining operators, managers and stakeholders involved in the planning and implementation of post-mining land restoration activities. Furthermore, the suggested methodology could be adopted to support the risk management needs in the restoration stage of complex surface mining projects.

[1]  Thomas L. Saaty,et al.  DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .

[2]  Hossein Hassani,et al.  Application of multi-criteria decision making methods in slope stability analysis of open pit mines , 2016, Journal of the Geological Society of India.

[3]  Michael Galetakis,et al.  Selection of optimal land uses for the reclamation of surface mines by using evolutionary algorithms , 2017 .

[4]  Yihan Wang Application of TOPSIS and AHP in the Multi-Objective Decision-Making Problems , 2018 .

[5]  C. Roumpos,et al.  Spatial analysis and evaluation of a coal deposit by coupling AHP & GIS techniques , 2019 .

[6]  Mohammad Ataei,et al.  Mining method selection by multiple criteria decision making tools , 2004 .

[7]  Michael Galetakis,et al.  A spatial decision support system for the optimal environmental reclamation of open-pit coal mines in Greece , 2009 .

[8]  A. D. Bradshaw,et al.  Restoration of mined lands—using natural processes , 1997 .

[9]  Ali Emrouznejad,et al.  The state of the art development of AHP (1979–2017): a literature review with a social network analysis , 2017, Int. J. Prod. Res..

[10]  Ali Kahriman,et al.  Application of fuzzy set theory in the selection of underground mining method , 2008 .

[11]  C. Musingwini,et al.  A survey of applications of multicriteria decision analysis methods in mine planning and related case studies. , 2016 .

[12]  Arzu Erener,et al.  Remote sensing of vegetation health for reclaimed areas of Seyitömer open cast coal mine , 2011 .

[13]  Richard J. Hobbs,et al.  Spontaneous Succession versus Technical Reclamation in the Restoration of Disturbed Sites , 2008 .

[14]  Jan J. Cilliers,et al.  Multi-criteria decision making for the choice problem in mining and mineral processing: Applications and trends , 2019, Expert Syst. Appl..

[15]  Z. Kasztelewicz Approaches to Post-Mining Land Reclamation in Polish Open-Cast Lignite Mining , 2014 .

[16]  Morteza Osanloo,et al.  Optimal Open Pit Mining Equipment Selection Using Fuzzy Multiple Attribute Decision Making Approach , 2009 .

[17]  Prasanta Kumar Dey,et al.  Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of Indian oil refinery , 2012 .

[18]  Sung-Min Kim,et al.  ArcMine: A GIS extension to support mine reclamation planning , 2012, Comput. Geosci..

[19]  Atac Bascetin,et al.  A decision support system using analytical hierarchy process (AHP) for the optimal environmental reclamation of an open-pit mine , 2007 .

[20]  Kamal M. Al‐Subhi Al‐Harbi,et al.  Application of the AHP in project management , 2001 .

[21]  Vassilios Kazakidis,et al.  Decision making using the analytic hierarchy process in mining engineering , 2004 .

[22]  T. Chuman Restoration Practices Used on Post Mining Sites and Industrial Deposits in the Czech Republic with an Example of Natural Restoration of Granodiorite Quarries and Spoil Heaps , 2015 .

[23]  G. Wiegleb,et al.  Development options of natural habitats in a post‐mining landscape , 2000 .