Value stream mapping to reduce the lead-time of a product development process

Product development (PD) is a broad field of endeavor dealing with the planning, design, creation, and marketing of a new product. This revolutionary research domain has become of paramount importance to beat the competition for multidisciplinary products which are larger in size and have a longer development time. The main focus of this article is to exploit lean thinking concepts in order to manage, improve and develop the product faster while improving or at least maintaining the level of performance and quality. Lean thinking concepts encompass a board range of tools and methods intended to produce bottom line results however, value stream mapping (VSM) method is used to explore the wastes, inefficiencies, non-valued added steps in a single, definable process out of complete product development process (PDP). This single step is highly complex and occurs once while the PDP lasts for 3–5 years. A case study of gas turbine product has been discussed to illustrate and justify the use of proposed framework. In order to achieve this, the following have been performed: First of all a current state map is developed using the Gemba walk. Furthermore, Subject Matter Experts (SMEs) brainstormed to explore the wastes and their root causes found during the Gemba walk and current state mapping. A future state map is also developed with removing all the wastes/inefficiencies. Besides numerous intangible benefits, it is expected that the VSM framework will help the development teams to reduce the PD lead-time by 50%.

[1]  Hong-Chao Zhang,et al.  An environmentally conscious evaluation/design support tool for personal computers , 1997, Proceedings of the 1997 IEEE International Symposium on Electronics and the Environment. ISEE-1997.

[2]  Manoj Kumar Tiwari,et al.  Implementing the Lean Sigma framework in an Indian SME: a case study , 2006 .

[3]  K. Narasimhan,et al.  Voice of the Customer: Capture and Analysis , 2009 .

[4]  Jeffrey K. Liker,et al.  Concurrent Engineering Effectiveness: Integrating Product Development Across Organizations , 1997 .

[5]  S. Vickery,et al.  The ability to minimize the timing of new product development and introduction: an examination of antecedent factors in the North American automobile supplier industry , 2000 .

[6]  A. Griffin,et al.  Consequences of New Product Development Speed: A Meta‐Analysis , 2013 .

[7]  Reza H. Ahmadi,et al.  Time-Cost Trade-Offs in Overlapped Product Development , 2000, Oper. Res..

[8]  Richard Lee Storch,et al.  Improving flow to achieve lean manufacturing in shipbuilding , 1999 .

[9]  Kai Yang,et al.  Modeling and optimization of direct metal laser sintering process , 2015 .

[10]  G. Anand,et al.  Development of a Conceptual Framework for Lean New Product Development Process , 2008 .

[11]  Zoe J. Radnor,et al.  Editorial: Lean in Public Services—Panacea or Paradox? , 2008 .

[12]  K. Demeter,et al.  The impact of lean practices on inventory turnover , 2011 .

[13]  Fawaz M. Abdullah,et al.  LEAN MANUFACTURING TOOLS AND TECHNIQUES IN THE PROCESS INDUSTRY WITH A FOCUS ON STEEL , 2003 .

[14]  Roberto Panizzolo,et al.  Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management , 1998 .

[15]  Gregory Howell,et al.  The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.

[16]  Elizabeth A. Cudney,et al.  Incorporating lean concepts into supply chain management , 2010 .

[17]  Ma Ga Yang,et al.  Impact of lean manufacturing and environmental management on business performance: An empirical study of manufacturing firms , 2011 .

[18]  Xianming Cai,et al.  Development of a Product Life-Cycle Cost Estimation Model to Support Engineering Decision-Making in a Multi-Generational Product Development Environment , 2014 .

[19]  Hugh McManus Product Development Value Stream Mapping (PDVSM) Manual Release 1.0 , 2005 .

[20]  Preston G. Smith,et al.  Developing Products in Half the Time: New Rules, New Tools, 2nd Edition (Создание новых продуктов за половину времени: новые правила, новые инструменты) , 1997 .

[21]  P. Kotler Marketing Management: Analysis, Planning, Implementation and Control , 1972 .

[22]  William G. Sullivan,et al.  EQUIPMENT REPLACEMENT DECISIONS AND LEAN MANUFACTURING , 2002 .

[23]  Kai Yang,et al.  Non-discrete ant colony optimisation (NdACO) to optimise the development cycle time and cost in overlapped product development , 2013 .

[24]  Erik Jan Hultink,et al.  4 Product development performance: strategy, organization and management in the world auto industry☆ , 1994 .

[25]  Kate Blackmon,et al.  The Competitiveness of European Manufacturing — A Four Country Study , 1995 .

[26]  Kenneth B. Kahn,et al.  Identifying new product development best practice , 2012 .

[27]  Pelin Pekgun-Cakmak An analysis of pricing and leadtime policies within the marketing/operations interface , 2007 .

[28]  Kai Yang,et al.  Activity-Based Costing Model for MGPD , 2011, ISPE CE.

[29]  David Wyn Simons,et al.  Lean thinking in the UK red meat industry: A systems and contingency approach , 2007 .

[30]  David J. Stockton,et al.  Predicting the effects of cycle time variability on the efficiency of electronics assembly mixed-model, zero-buffer flow processing lines , 2010, Int. J. Comput. Integr. Manuf..

[31]  D. Wilemon,et al.  A Survey of Major Approaches for Accelerating New Product Development , 1992 .

[32]  Badr Haque,et al.  Applying lean thinking to new product introduction , 2004 .

[33]  Kai Yang,et al.  Development of a fuzzy goal programming model for optimization of lead time and cost in an overlapped product development project using a Gaussian Adaptive Particle Swarm Optimization-based approach , 2011, Eng. Appl. Artif. Intell..

[34]  Manoj Kumar Tiwari,et al.  Optimal part orientation in layered manufacturing using evolutionary stickers-based DNA algorithm , 2007 .

[35]  Donald M. Anderson,et al.  Agile product development for mass customization , 1997 .

[36]  MengChu Zhou,et al.  A methodology for modeling and adaptive planning of disassembly processes , 1999, IEEE Trans. Robotics Autom..

[37]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[38]  Kim B. Clark,et al.  Product development performance : strategy, organization, and management in the world auto industry / Kim B. Clark, Tahahiro Fujimoto , 1991 .

[39]  Fred Langerak,et al.  The impact of new product development acceleration approaches on speed and profitability: lessons for pioneers and fast followers , 2005, IEEE Transactions on Engineering Management.

[40]  B. Williams,et al.  Operations management. , 2001, Optometry.

[41]  Unny Menon,et al.  Concurrent engineering : concepts, implementation and practice , 1994 .

[42]  Colin Herron,et al.  A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies , 2006 .

[43]  Katherine Radeka The Mastery of Innovation: A Field Guide to Lean Product Development , 2012 .

[44]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[45]  Timothy David Quinn,et al.  The implementation dynamics of continuous improvement throughout the corporate hierarchy based on lean six sigma at DTE energy by Timothy David Quinn. , 2011 .

[46]  Michael Burda,et al.  Revolutionizing product development , 1993 .

[47]  Kai Yang,et al.  A Fuzzy Goal Programming Approach for Optimal Product Family Design of Mobile Phones and Multiple-Platform Architecture , 2012, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).

[48]  Geoff Vincent,et al.  —Managing— New-Product Development , 1989, Springer US.

[49]  Computer Staff,et al.  The Machine That Changed the World , 1992 .

[50]  Mary Poppendieck,et al.  Lean Software Development: An Agile Toolkit , 2003 .

[51]  Philip Yetton,et al.  Improving Group Performance by Training in Individual Problem Solving , 1987 .

[52]  Michael N. Kennedy Product Development for the Lean Enterprise: Why Toyota''''s System Is Four Times More Productive an , 2003 .

[53]  Suresh Garg,et al.  Value stream mapping: literature review and implications for Indian industry , 2011 .

[54]  H. Maylor Concurrent new product development: an empirical assessment , 1997 .

[55]  Simon J. Towner Four ways to accelerate new product development , 1994 .

[56]  Bruno Agard,et al.  Modular design of product families for quality and cost , 2013 .

[57]  Vaibhav Gupta,et al.  Application of value stream mapping for lean operations and cycle time reduction: an Indian case study , 2005 .

[58]  Christina Jampoler Houlahan Reduction of front-end loading of inventory : making the airframe industry lean through better inventory management , 1994 .

[59]  James Kohnen,et al.  The Lean Product Development Guidebook: Everything Your Design Team Needs to Improve Efficiency and Slash Time-to-Market , 2007 .

[60]  Jeffrey K. Liker,et al.  The Toyota Product Development System: Integrating People, Process And Technology , 2006 .

[61]  Dragan Stokic,et al.  The Conceptual LeanPPD Model , 2010, ISPE CE.

[62]  Durk-Jouke van der Zee,et al.  Lean planning in the semi-process industry, a case study , 2011 .

[63]  J. Worley,et al.  The role of communication and management support in a lean manufacturing implementation , 2006 .

[64]  Ikujiro Nonaka,et al.  Managing the new product development process , 1985 .

[65]  Amy C. Lodge,et al.  Health service improvement through diagnostic waiting list management. , 2007, Leadership in health services.