Two-Machine Super-Shop Scheduling Problem
暂无分享,去创建一个
[1] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[2] Teofilo F. Gonzalez,et al. Open Shop Scheduling to Minimize Finish Time , 1976, JACM.
[3] Hiroaki Ishii,et al. The mixed shop scheduling problem , 1985, Discret. Appl. Math..
[4] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[5] Teofilo F. Gonzalez,et al. Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..
[6] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .