Initial studies toward real-time transmission path rating
暂无分享,去创建一个
Demand continues to increase while transmission line construction is being constrained by multiple factors-economic, environmental, and political. Effective and efficient utilization of transmission lines is thus of great importance in an open access environment. Large blocks of power are transferred from areas with inexpensive generation to heavy load demand areas or areas with high generation costs. This results in some transmission paths being loaded closer to their path ratings, which limits further power transfer between areas. Traditionally, rating of important paths was determined off line by assuming the worst-case study scenario; once determined, it could be used for years. With increasing uncertainty arising from rapid growth of renewable energy and smart technologies, path rating studies are needed in near-real time to account for the latest system status and support a reliable and economic power grid. This paper adopts a simplified procedure based on standards of the North American Electric Reliability Corporation (NERC) to determine total transfer capability (TTC) or transfer limit for the purpose of demonstrating the benefits and necessity of real-time path rating. Initial studies are conducted to compute TTC of a two-area test system and a 39-bus test system. Results indicate that path rating can be significantly affected by loading conditions, generator schedules, system topology and other factors.
[1] P. Kundur,et al. Power system stability and control , 1994 .