Integration of Cost and Schedule Using BIM
暂无分享,去创建一个
[1] Claudio Benghi,et al. Developing 5D system connecting cost, schedule and 3D model , 2010 .
[2] Osama Abudayyeh,et al. Cost‐ and Schedule‐Control Integration: Issues and Needs , 1991 .
[3] David Heesom,et al. Trends of 4D CAD applications for construction planning , 2004 .
[4] Robert I. Carr. COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION , 1993 .
[5] Nashwan Dawood,et al. DEVELOPMENT OF AN INTEGRATED INFORMATION RESOURCE BASE FOR 4D/VR CONSTRUCTION PROCESSES SIMULATION , 2003 .
[6] Jae-Jun Kim,et al. Management of Daily Progress in a Construction Project of Multiple Apartment Buildings , 2007 .
[7] Alberto De Marco,et al. Cost and Schedule Monitoring of Industrial Building Projects: Case Study , 2009 .
[8] Sungkwon Woo,et al. Flexible Work Breakdown Structure for Integrated Cost and Schedule Control , 2004 .
[9] Ghassan Aouad,et al. Moving beyond the fourth dimension with an IFC-based single project database , 2005 .