Reliability analysis of a cold standby repairable system with repairman extra work

This paper deals with a cold standby repairable system with two identical units and one repairman who can do extra work in idle time. The authors are devoted to studying the unique existence and exponential stability of the system solution. C0-semigroup theory is used to prove the existence of a unique nonnegative time-dependent solution of the system. Then by using the theory of resolvent positive operator, the authors derive that dynamic solution of the system exponentially converges to its steady-state one which is the eigenfunction corresponding to eigenvalue 0 of the system operator. Some reliability indices of the system are discussed with a different method from traditional one. The authors also make a profit analysis to determine the optimal service time outside the system to maximize the system profit.

[1]  Wen-Chiung Lee,et al.  Reliability and sensitivity analysis of a system with multiple unreliable service stations and standby switching failures , 2007 .

[2]  Genqi Xu,et al.  Stability analysis of a complex standby system with constant waiting and different repairman criteria incorporating environmental failure , 2009 .

[3]  Mohammed Ghanbari,et al.  Introduction to reliability , 1997 .

[4]  Genqi Xu,et al.  The well-posedness and stability of a repairable standby human-machine system , 2006, Math. Comput. Model..

[5]  Tang Ying-hui One-unit Repairable System with Multiple Delay Vacations , 2006 .

[6]  Lev V. Utkin,et al.  The time-dependent availability of repairable m-out-of-n and cold standby systems by arbitrary distributions and repair facilities , 1995 .

[7]  He Ping Reliability Analysis of Two Supplemental Equipments Cold Standby System of Power Station , 2009 .

[8]  Ming J. Zuo,et al.  A bivariate optimal replacement policy for a multistate repairable system , 2007, Reliab. Eng. Syst. Saf..

[9]  Wolfgang Arendt,et al.  Resolvent Positive Operators , 1987 .

[10]  M. Gopalan,et al.  On the transient behaviour of a repairable system with a warm standby , 1996 .

[11]  Yuan Lin Zhang,et al.  A geometric process repair model for a repairable cold standby system with priority in use and repair , 2009, Reliab. Eng. Syst. Saf..

[12]  Dequan Yue,et al.  A discrete-time Geo/G/1 retrial queue with J-vacation policy and general retrial times , 2013, J. Syst. Sci. Complex..

[13]  J. Partington,et al.  Introduction to Functional Analysis , 1981, The Mathematical Gazette.

[14]  Shaomin Wu,et al.  Optimizing replacement policy for a cold-standby system with waiting repair times , 2009, Appl. Math. Comput..

[15]  Guangtian Zhu,et al.  Stability analysis of a new kind n-unit series repairable system , 2011 .

[16]  Yinghui Tang On The Transient Departure Process of Mx/G/1 Queueing System with Single Server Vacation , 2007, J. Syst. Sci. Complex..

[17]  Angus E. Taylor,et al.  Introduction to functional analysis, 2nd ed. , 1986 .

[18]  George Kokolakis,et al.  Reliability analysis of a two-unit general parallel system with (n-2) warm standbys , 2010, Eur. J. Oper. Res..

[19]  Zifei Shen,et al.  Exponential asymptotic property of a parallel repairable system with warm standby under common-cause failure , 2008 .

[20]  Michael J. Armstrong,et al.  Age repair policies for the machine repair problem , 2002, Eur. J. Oper. Res..

[21]  Yinghui Tang,et al.  Reliability indices of discrete-time Geox/G/1 queueing system with unreliable service station and multiple adaptive delayed vacations , 2012, J. Syst. Sci. Complex..

[22]  Kuo-Hsiung Wang,et al.  (Applied Mathematical Modelling,31(5):880-894 )Vacation Policies for Machine Repair Problem with Two Type Spares , 2007 .

[23]  Jyotirmoy Sarkar,et al.  A standby system with two repair persons under arbitrary life- and repair times , 2010, Math. Comput. Model..

[24]  Madhu Jain,et al.  Bilevel control of degraded machining system with warm standbys, setup and vacation , 2004 .

[25]  Lev V. Utkin,et al.  Cold standby systems with imperfect and noninstantaneous switch-over mechanism , 1996 .

[26]  Yuan Lin Zhang,et al.  A deteriorating cold standby repairable system with priority in use , 2007, Eur. J. Oper. Res..