Recycling the construction and demolition waste in Vietnam: opportunities and challenges in practice
暂无分享,去创建一个
Karli Verghese | Simon Lockrey | Enda Crossin | Hung Nguyen | K. Verghese | E. Crossin | H. Nguyen | S. Lockrey
[1] Bin Zhang,et al. Does Industrial Waste Reuse Bring Dual Benefits of Economic Growth and Carbon Emission Reduction?: Evidence of Incorporating the Indirect Effect of Economic Growth in China , 2016 .
[2] Calvin Lakhan,et al. The relationship between municipal waste diversion incentivization and recycling system performance , 2016 .
[3] Timo Jouttijärvi,et al. Construction and demolition waste management – a holistic evaluation of environmental performance , 2015 .
[4] C. M. Tam,et al. Mapping Approach for Examining Waste Management on Construction Sites , 2004 .
[5] Vivian W. Y Tam,et al. Designers’ attitude and behaviour towards construction waste minimization by design: A study in Shenzhen, China , 2015 .
[6] Salah El Haggar,et al. Sustainable industrial design and waste management , 2013 .
[7] Stephen O. Ogunlana,et al. A study on project success factors in large construction projects in Vietnam , 2004 .
[8] Florence Yean Yng Ling,et al. Strategies for construction waste management in Ho Chi Minh City, Vietnam , 2013 .
[9] Mark Smithers,et al. Implementing a waste management plan during the construction phase of a project: a case study , 1998 .
[10] Jinhui Li,et al. Ecodesign in Consumer Electronics: Past, Present, and Future , 2015 .
[11] C S Poon,et al. Management of construction and demolition waste. , 2007, Waste management.
[12] Jamilus Md Hussin,et al. The Way Forward in Sustainable Construction: Issues and Challenges , 2013 .
[13] Blessen Skariah Thomas,et al. Assessment of durability characteristics of cement concrete containing jarosite , 2016 .
[14] Helen Lewis,et al. Packaging's Role in Minimizing Food Loss and Waste Across the Supply Chain , 2015 .
[15] Nguyen Thi Kim Thai,et al. Hazardous industrial waste management in Vietnam: current status and future direction , 2009 .
[16] Valeria Ibáñez-Forés,et al. Life cycle assessment of construction and demolition waste management systems: a Spanish case study , 2012, The International Journal of Life Cycle Assessment.
[17] Blessen Skariah Thomas,et al. Properties of concrete containing jarosite as a partial substitute for fine aggregate , 2016 .
[18] Nguyen Trung Viet,et al. Status and strategies on solid waste management in Ho Chi Minh City , 2009 .
[19] Marta Cabral,et al. Packaging waste recycling in Europe: is the industry paying for it? , 2014, Waste management.
[20] Clodagh McGrath,et al. Waste minimisation in practice , 2001 .
[21] Paola Sassi,et al. Defining closed-loop material cycle construction , 2008 .
[22] André Coelho,et al. Environmental analysis of a construction and demolition waste recycling plant in Portugal--Part II: Environmental sensitivity analysis. , 2013, Waste management.
[23] Vivian W. Y Tam,et al. Dynamic modeling of construction and demolition waste management processes: An empirical study in Shenzhen, China , 2010 .
[24] D. MacInnis,et al. A Framework for Conceptual Contributions in Marketing , 2011, How to Get Published in the Best Marketing Journals.
[25] Chi Ming Tam,et al. Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations , 2007 .
[26] Sumita Dixit,et al. Toxic hazards of leather industry and technologies to combat threat: a review , 2015 .
[27] Guiwen Liu,et al. Quantifying construction and demolition waste: an analytical review. , 2014, Waste management.
[28] Cecilia Bengtsson,et al. Waste flow mapping to improve sustainability of waste management : A case study approach , 2015 .
[29] Martin Loosemore,et al. A theory of waste behaviour in the construction industry , 2001 .
[30] Vivian W. Y Tam,et al. Comparing the implementation of concrete recycling in the Australian and Japanese construction industries , 2009 .