The Dynamics of Proximal and Distal Factors in Construction Site Water Pollution

Abstract Construction site water pollution causes irreversible damages to the surrounding environment with additional cost, time and resources required for rectification works. Construction teams are often blamed for causing site water pollution. Little thought has been given to recognize the underlying reasons for the undesirable actions, particularly the distal factors. In construction, safety and accident research has provided a strong theoretical background that focused on distal factors. Therefore, this study aims to use the basis of accident causation model to identify the distal and proximal factors for site water pollution that will be represented using the Causal Loop Diagram. The use of Causal Loop Diagram establishes a new scientific approach towards portraying the dynamic interaction between the distal and proximal factors for site water pollution, further narrowing down the factors to be enhanced or controlled. This study has employed three different methods (in-depth interview, systematic review and case study) to identify the potential distal and proximal factors. Findings from the study suggest that the root cause for site water pollution lies on the distal factor that stems from funding. From a dynamic perspective, positive improvements made on funding could reduce the negative effects on the ensuing factors. In summary, distal factors have a domino effect on the proximal factors where the dynamic interaction between them could ultimately increase the risk of site water pollution. The outcome of this study would be a transparent and holistic perspective on the underlying causes of site water pollution that embraces the concept of pollution prevention.

[1]  Haifeng Jia,et al.  Advances in LID BMPs research and practice for urban runoff control in China , 2013, Frontiers of Environmental Science & Engineering.

[2]  Keith R. Molenaar,et al.  Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays , 2010 .

[3]  Stephen O. Ogunlana,et al.  Conflict dynamics in a dam construction project: a case study , 2011 .

[4]  Pramen P. Shrestha,et al.  Delay Claim Analysis in the Construction Industry , 2014 .

[5]  Luis Enrique Sánchez,et al.  Follow-up of a road building scheme in a fragile environment , 2002 .

[6]  A. Roy Duff,et al.  Development of Causal Model of Construction Accident Causation , 2001 .

[7]  Sathyanarayanan Rajendran,et al.  Design’s role in construction accident causality and prevention: Perspectives from an expert panel , 2008 .

[8]  David E. Shiers,et al.  Construction law and environmental harm: the liability interface , 2000 .

[9]  Edeltraud Guenther,et al.  Carbon accounting: a systematic literature review , 2012 .

[10]  Liyin Shen,et al.  Embedding “green” in project-based organizations: the way ahead in the construction industry? , 2015 .

[11]  Nuria Forcada,et al.  An Environmental Impact Causal Model for improving the environmental performance of construction processes , 2013 .

[12]  Edward R. Fisk Construction Project Administration , 1978 .

[13]  Albert P.C. Chan,et al.  Critical Review of Labor Productivity Research in Construction Journals , 2014 .

[14]  Scott Fernie,et al.  Knowledge Sharing: Context, Controversy and Confusion , 2003 .

[15]  Keith Tizzard,et al.  Management System Dynamics , 1977 .

[16]  Miroslaw J. Skibniewski,et al.  Information and Communication Technology Applications in Architecture, Engineering, and Construction Organizations: A 15-Year Review , 2015 .

[17]  Richard A. Millet Failures: How to Avoid Them , 1999 .

[18]  Xin Miao,et al.  The latent causal chain of industrial water pollution in China. , 2015, Environmental pollution.

[19]  M. Marshall Sampling for qualitative research. , 1996, Family practice.

[20]  A. Cerda,et al.  Soil water erosion on road embankments in eastern Spain. , 2007, The Science of the total environment.

[21]  Björn Frostell,et al.  Group Model-Building to identify potential sources of environmental impacts outside the scope of LCA studies , 2014 .

[22]  SangUk Han,et al.  Toward an understanding of the impact of production pressure on safety performance in construction operations. , 2014, Accident; analysis and prevention.

[23]  D. Koca,et al.  Use of Casual Loop Diagrams and Systems Analysis to Explore Alternative Climate Change Adaptation Strategies in Seyhan River Basin, Turkey , 2012 .

[24]  Becky Beal,et al.  `Keeping It Real' , 2003 .

[25]  L B Faucette,et al.  Large-scale performance and design for construction activity erosion control best management practices. , 2009, Journal of environmental quality.

[26]  C. Romano,et al.  Research Strategies for Small Business: A Case Study Approach , 1989 .

[27]  Kincho H. Law,et al.  System Dynamic Approach for Simulation of Experience Transfer in the AEC Industry , 2009 .

[28]  Peter E.D. Love,et al.  Determining the causal structure of rework influences in construction , 1999 .

[29]  Robert Pitt,et al.  Stormwater Effects Handbook: A Toolbox for Watershed Managers, Scientists, and Engineers , 2001 .

[30]  S. Shrestha,et al.  Soil erosion control from construction sites : an important aspect of watershed conservation , 2004 .

[31]  Muttucumaru Sivakumar,et al.  Wastewater and stormwater minimisation in a coal mine , 2000 .

[32]  Glenn A. Bowen Preparing a Qualitative Research-Based Dissertation: Lessons Learned , 2005 .

[33]  R. A. Haslama,et al.  Contributing factors in construction accidents , 2005 .

[34]  Carlos Ochoa,et al.  Modeling Sustainability of Water, Environment, Livelihood, and Culture in Traditional Irrigation Communities and Their Linked Watersheds , 2012 .

[35]  C. R. Davis,et al.  Selection of Erosion Control Measures for Highway Construction , 2003 .

[36]  C. Leggett,et al.  Management system dynamics: R.G. COYLE, U.K., 1977, 463 pages, Hardback £16.95, $ 32.00, Paperback £6.95, $ 13.00 , 1977 .

[37]  R. Yin Case Study Research: Design and Methods , 1984 .

[38]  Moonseo Park,et al.  Boost, Control, or Both of Korean Housing Market: 831 Countermeasures , 2010 .

[39]  Martin M. Kaufman Erosion Control at Construction Sites: The Science–Policy Gap , 2000, Environmental management.

[40]  Yasser Mohamed,et al.  Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance , 2009 .

[41]  S. Thomas Ng,et al.  Sustainable Building Development in China - A System Thinking Study , 2014 .

[42]  Albert P.C. Chan,et al.  Research Trend of Public-Private Partnership in Construction Journals , 2009 .

[43]  Bo-Christer Björk,et al.  Where to submit? Journal choice by construction management authors , 2008 .

[44]  Omer Tatari,et al.  Towards greening the U.S. residential building stock: A system dynamics approach , 2014 .

[45]  J. K. Yates Design and Construction for Sustainable Industrial Construction , 2014 .

[46]  Geoff Coyle,et al.  Qualitative Modelling in System Dynamics or What are the Wise Limits of Quantification? , 1999 .

[47]  A. S. Alnuaimi,et al.  Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman , 2010 .

[48]  Jianli Hao,et al.  Modeling Effective Construction Waste Management Through Causal Loop Diagrams , 2014 .

[49]  M. Petticrew,et al.  Systematic Reviews in the Social Sciences: A Practical Guide , 2005 .

[50]  Paul Bowen,et al.  Sustainable construction: principles and a framework for attainment , 1997 .

[51]  Unit soil loss rate from various construction sites during a storm. , 2009, Water science and technology : a journal of the International Association on Water Pollution Research.

[52]  C. Perry,et al.  Implementation of realism in case study research methodology , 2000 .

[53]  Weisheng Lu,et al.  A computer-based scoring method for measuring the environmental performance of construction activities , 2005 .

[54]  V. Minichiello In-depth Interviewing: Researching People , 1992 .

[55]  Jon Harbor,et al.  Engineering geomorphology at the cutting edge of land disturbance: erosion and sediment control on construction sites , 1999 .

[56]  Geoff Coyle,et al.  The validation of commercial system dynamics models , 2000 .

[57]  John Glasson,et al.  Causal networks in EIA , 2006 .

[58]  Zahra Jabbarani Torghabeh,et al.  Ajor Theories of Construction Accident Causation Models : a Literature Review , 2012 .

[59]  F L Cole,et al.  Content Analysis: Process and Application , 1988, Clinical nurse specialist CNS.

[60]  L. M. Sidek,et al.  Expert system for mitigating erosion and sedimentation due to storm water during construction activities in Malaysia , 2009 .

[61]  Bo Terje Kalsaas,et al.  Waste in Construction: a Systematic Literature Review on Empirical Studies , 2012 .

[62]  He Zhang,et al.  Modelling Environmental Impact with a Goal and Causal Relation Integrated Approach , 2010 .

[63]  John D. Sterman,et al.  Business dynamics : systems thinking and modelling for acomplex world , 2002 .

[64]  John P. Spillane,et al.  Confined site construction: A qualitative investigation of critical issues affecting management of health and safety , 2011 .

[65]  Awad S. Hanna,et al.  Decision Tree Approach to Classify and Quantify Cumulative Impact of Change Orders on Productivity , 2004 .

[66]  Vivian W. Y Tam,et al.  Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice , 2010 .

[67]  M. Frondel,et al.  End-of-Pipe or Cleaner Production? An Empirical Comparison of Environmental Innovation Decisions Across OECD Countries , 2007 .

[68]  C. I. McGinnis,et al.  Constructability in Public Sector , 1996 .

[69]  Raymond J. Cole,et al.  Building environmental assessment methods: assessing construction practices , 2000 .

[70]  Gavin Hilson,et al.  Defining “cleaner production” and “pollution prevention” in the mining context , 2003 .

[71]  Hong Yao,et al.  Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects , 2011 .

[72]  C. Boyce,et al.  Conducting in-depth interviews: a guide for designing and conducting in-depth interviews for evaluation input. , 2006 .

[73]  Barbara M. Wildemuth,et al.  Applications of Social Research Methods to Questions in Information and Library Science , 2009 .

[74]  Darci L Houser,et al.  The effects of construction on water quality: a case study of the culverting of Abram Creek , 2009, Environmental monitoring and assessment.

[75]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[76]  James T. Reason,et al.  A systems approach to organizational error , 1995 .

[77]  H. Gao,et al.  Current Situation Analysis on Soil Erosion Risk Management in Development and Construction Project , 2012 .

[78]  Helvi Kyngäs,et al.  The qualitative content analysis process. , 2008, Journal of advanced nursing.

[79]  A. Ismail,et al.  Rapid prototyping expert systems for minimising river pollution during highway construction activities. , 2009 .

[80]  Chau Kwong Wing,et al.  The ranking of construction management journals , 1997 .