The Dynamics of Proximal and Distal Factors in Construction Site Water Pollution
暂无分享,去创建一个
[1] Haifeng Jia,et al. Advances in LID BMPs research and practice for urban runoff control in China , 2013, Frontiers of Environmental Science & Engineering.
[2] Keith R. Molenaar,et al. Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays , 2010 .
[3] Stephen O. Ogunlana,et al. Conflict dynamics in a dam construction project: a case study , 2011 .
[4] Pramen P. Shrestha,et al. Delay Claim Analysis in the Construction Industry , 2014 .
[5] Luis Enrique Sánchez,et al. Follow-up of a road building scheme in a fragile environment , 2002 .
[6] A. Roy Duff,et al. Development of Causal Model of Construction Accident Causation , 2001 .
[7] Sathyanarayanan Rajendran,et al. Design’s role in construction accident causality and prevention: Perspectives from an expert panel , 2008 .
[8] David E. Shiers,et al. Construction law and environmental harm: the liability interface , 2000 .
[9] Edeltraud Guenther,et al. Carbon accounting: a systematic literature review , 2012 .
[10] Liyin Shen,et al. Embedding “green” in project-based organizations: the way ahead in the construction industry? , 2015 .
[11] Nuria Forcada,et al. An Environmental Impact Causal Model for improving the environmental performance of construction processes , 2013 .
[12] Edward R. Fisk. Construction Project Administration , 1978 .
[13] Albert P.C. Chan,et al. Critical Review of Labor Productivity Research in Construction Journals , 2014 .
[14] Scott Fernie,et al. Knowledge Sharing: Context, Controversy and Confusion , 2003 .
[15] Keith Tizzard,et al. Management System Dynamics , 1977 .
[16] Miroslaw J. Skibniewski,et al. Information and Communication Technology Applications in Architecture, Engineering, and Construction Organizations: A 15-Year Review , 2015 .
[17] Richard A. Millet. Failures: How to Avoid Them , 1999 .
[18] Xin Miao,et al. The latent causal chain of industrial water pollution in China. , 2015, Environmental pollution.
[19] M. Marshall. Sampling for qualitative research. , 1996, Family practice.
[20] A. Cerda,et al. Soil water erosion on road embankments in eastern Spain. , 2007, The Science of the total environment.
[21] Björn Frostell,et al. Group Model-Building to identify potential sources of environmental impacts outside the scope of LCA studies , 2014 .
[22] SangUk Han,et al. Toward an understanding of the impact of production pressure on safety performance in construction operations. , 2014, Accident; analysis and prevention.
[23] D. Koca,et al. Use of Casual Loop Diagrams and Systems Analysis to Explore Alternative Climate Change Adaptation Strategies in Seyhan River Basin, Turkey , 2012 .
[24] Becky Beal,et al. `Keeping It Real' , 2003 .
[25] L B Faucette,et al. Large-scale performance and design for construction activity erosion control best management practices. , 2009, Journal of environmental quality.
[26] C. Romano,et al. Research Strategies for Small Business: A Case Study Approach , 1989 .
[27] Kincho H. Law,et al. System Dynamic Approach for Simulation of Experience Transfer in the AEC Industry , 2009 .
[28] Peter E.D. Love,et al. Determining the causal structure of rework influences in construction , 1999 .
[29] Robert Pitt,et al. Stormwater Effects Handbook: A Toolbox for Watershed Managers, Scientists, and Engineers , 2001 .
[30] S. Shrestha,et al. Soil erosion control from construction sites : an important aspect of watershed conservation , 2004 .
[31] Muttucumaru Sivakumar,et al. Wastewater and stormwater minimisation in a coal mine , 2000 .
[32] Glenn A. Bowen. Preparing a Qualitative Research-Based Dissertation: Lessons Learned , 2005 .
[33] R. A. Haslama,et al. Contributing factors in construction accidents , 2005 .
[34] Carlos Ochoa,et al. Modeling Sustainability of Water, Environment, Livelihood, and Culture in Traditional Irrigation Communities and Their Linked Watersheds , 2012 .
[35] C. R. Davis,et al. Selection of Erosion Control Measures for Highway Construction , 2003 .
[36] C. Leggett,et al. Management system dynamics: R.G. COYLE, U.K., 1977, 463 pages, Hardback £16.95, $ 32.00, Paperback £6.95, $ 13.00 , 1977 .
[37] R. Yin. Case Study Research: Design and Methods , 1984 .
[38] Moonseo Park,et al. Boost, Control, or Both of Korean Housing Market: 831 Countermeasures , 2010 .
[39] Martin M. Kaufman. Erosion Control at Construction Sites: The Science–Policy Gap , 2000, Environmental management.
[40] Yasser Mohamed,et al. Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance , 2009 .
[41] S. Thomas Ng,et al. Sustainable Building Development in China - A System Thinking Study , 2014 .
[42] Albert P.C. Chan,et al. Research Trend of Public-Private Partnership in Construction Journals , 2009 .
[43] Bo-Christer Björk,et al. Where to submit? Journal choice by construction management authors , 2008 .
[44] Omer Tatari,et al. Towards greening the U.S. residential building stock: A system dynamics approach , 2014 .
[45] J. K. Yates. Design and Construction for Sustainable Industrial Construction , 2014 .
[46] Geoff Coyle,et al. Qualitative Modelling in System Dynamics or What are the Wise Limits of Quantification? , 1999 .
[47] A. S. Alnuaimi,et al. Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman , 2010 .
[48] Jianli Hao,et al. Modeling Effective Construction Waste Management Through Causal Loop Diagrams , 2014 .
[49] M. Petticrew,et al. Systematic Reviews in the Social Sciences: A Practical Guide , 2005 .
[50] Paul Bowen,et al. Sustainable construction: principles and a framework for attainment , 1997 .
[51] Unit soil loss rate from various construction sites during a storm. , 2009, Water science and technology : a journal of the International Association on Water Pollution Research.
[52] C. Perry,et al. Implementation of realism in case study research methodology , 2000 .
[53] Weisheng Lu,et al. A computer-based scoring method for measuring the environmental performance of construction activities , 2005 .
[54] V. Minichiello. In-depth Interviewing: Researching People , 1992 .
[55] Jon Harbor,et al. Engineering geomorphology at the cutting edge of land disturbance: erosion and sediment control on construction sites , 1999 .
[56] Geoff Coyle,et al. The validation of commercial system dynamics models , 2000 .
[57] John Glasson,et al. Causal networks in EIA , 2006 .
[58] Zahra Jabbarani Torghabeh,et al. Ajor Theories of Construction Accident Causation Models : a Literature Review , 2012 .
[59] F L Cole,et al. Content Analysis: Process and Application , 1988, Clinical nurse specialist CNS.
[60] L. M. Sidek,et al. Expert system for mitigating erosion and sedimentation due to storm water during construction activities in Malaysia , 2009 .
[61] Bo Terje Kalsaas,et al. Waste in Construction: a Systematic Literature Review on Empirical Studies , 2012 .
[62] He Zhang,et al. Modelling Environmental Impact with a Goal and Causal Relation Integrated Approach , 2010 .
[63] John D. Sterman,et al. Business dynamics : systems thinking and modelling for acomplex world , 2002 .
[64] John P. Spillane,et al. Confined site construction: A qualitative investigation of critical issues affecting management of health and safety , 2011 .
[65] Awad S. Hanna,et al. Decision Tree Approach to Classify and Quantify Cumulative Impact of Change Orders on Productivity , 2004 .
[66] Vivian W. Y Tam,et al. Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice , 2010 .
[67] M. Frondel,et al. End-of-Pipe or Cleaner Production? An Empirical Comparison of Environmental Innovation Decisions Across OECD Countries , 2007 .
[68] C. I. McGinnis,et al. Constructability in Public Sector , 1996 .
[69] Raymond J. Cole,et al. Building environmental assessment methods: assessing construction practices , 2000 .
[70] Gavin Hilson,et al. Defining “cleaner production” and “pollution prevention” in the mining context , 2003 .
[71] Hong Yao,et al. Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects , 2011 .
[72] C. Boyce,et al. Conducting in-depth interviews: a guide for designing and conducting in-depth interviews for evaluation input. , 2006 .
[73] Barbara M. Wildemuth,et al. Applications of Social Research Methods to Questions in Information and Library Science , 2009 .
[74] Darci L Houser,et al. The effects of construction on water quality: a case study of the culverting of Abram Creek , 2009, Environmental monitoring and assessment.
[75] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[76] James T. Reason,et al. A systems approach to organizational error , 1995 .
[77] H. Gao,et al. Current Situation Analysis on Soil Erosion Risk Management in Development and Construction Project , 2012 .
[78] Helvi Kyngäs,et al. The qualitative content analysis process. , 2008, Journal of advanced nursing.
[79] A. Ismail,et al. Rapid prototyping expert systems for minimising river pollution during highway construction activities. , 2009 .
[80] Chau Kwong Wing,et al. The ranking of construction management journals , 1997 .