Discussion on Compound Channel of Tianjin Port
暂无分享,去创建一个
The main channel of Tianjin Port can permit double-way navigation of 250 000 DWT ships.But at the present,large and small ships pass confusedly and density of ship flow is very large.According to the predicta-tion,the throughoutput in the year of 2020 will reach 70 million tonnage and the numbers of ship arriving at the port will futher increase.In such way,the main channel will be difficulty to meet the requirement.Through the analysis on the data of ships actually arriving at the port for many years and the prediction,the ships less than 10 000 DWT will amout to 70% or more.Therefore,the 10 000 DWT one-way channel are proposed to excavate at the two sides,the south and north of the main channel for the special service of ships less than 10 000 DWT.As for the ships more than 10 000 DWT will still navigate the main channel.The navigation of the ships in the separate channel will form the compound channel which can meet the need of the future development of througoutput.Meanwhile through the adjustment of approaching anchorage,the phenomenon of navigation crossing when ship entering and departing port can be avoided.