Long-Term Statistical Assessment of Frequency Regulation Reserves Policies in the Québec Interconnection

Since 2003, Hydro-Québec Distribution has launched three calls for tenders to procure 3500 MW of wind power. This will bring the projected wind capacity in the Québec Interconnection to 4000 MW in 2015, for about 5% energy and 35% maximum hourly penetration rates. This paper presents two statistical approaches for assessing the additional frequency regulation reserves needed to reliably integrate 3000 MW of wind energy from 23 plants, for which minute/minute output time series were developed over an 11-year period and synchronized with historical load patterns. After description of a generalized dispatch-based approach for separating automatic generation control (AGC) and load-following components, a risk-based allocation method inspired from the BPA 2010 rate case is presented in detail, and then compared with the n × σ approach using the same data set. While the risk-based allocation forecasted AGC and load-following increasing by 1.8% and 20.6% of installed wind capacity, the n × σ criterion resulted in much lower incremental reserves requirements with only 0.4% and 6.8% increases of the AGC (n=4) and load-following (n=2), respectively. In a companion paper, the power grid operations-based simulation approach is presented and its results compared with those of this paper.

[1]  E. Hirst,et al.  Defining intra- and interhour load swings , 1996 .

[2]  G. M. McNerney,et al.  Markov method for simulating non-Gaussian wind speed time series , 1985 .

[3]  M. Sherris,et al.  Risk Based Capital and Capital Allocation in Insurance , 2014 .

[4]  E. Kahn Wind integration studies: optimization vs. Simulation , 2010 .

[5]  Ming Hu,et al.  ISO perspective and experience with integrating wind power forecasts into operations , 2010, IEEE PES General Meeting.

[6]  Howard F. Illian Frequency Control Performance Measurement and Requirements , 2011 .

[7]  M. Grenier Short-term load forecasting at Hydro-Quebec TransEnergie , 2006, 2006 IEEE Power Engineering Society General Meeting.

[8]  P. Embrechts,et al.  Risk Management: Correlation and Dependence in Risk Management: Properties and Pitfalls , 2002 .

[9]  Viktoria Neimane,et al.  Using Standard Deviation as a Measure of Increased Operational Reserve Requirement for Wind Power , 2008 .

[10]  Kristina Hamachi LaCommare Review of the Recent Frequency Performance of the Eastern, Western and ERCOT Interconnections , 2011 .

[11]  Joseph H. Eto,et al.  Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation , 2011 .

[12]  P. Embrechts,et al.  Correlation and Dependency in Risk Management , 2002 .

[13]  Jian Ma,et al.  Operational Impacts of Wind Generation on California Power Systems , 2009, IEEE Transactions on Power Systems.

[14]  Brian Vad Mathiesen,et al.  A review of computer tools for analysing the integration of renewable energy into various energy systems , 2010 .