Understanding and implementing CIM through BPR

CIM and BPR are seen as two kinds of means whereby performance can be improved while flexibility is, at the same time, also being enhanced. Highlights similarities as well as differences between BPR and CIM through comparative analysis. Emphasizes that CIM is still an incremental approach to enterprise performance improvement although much information technology is being used, and that radical changes will not be achieved without combining with BPR. Analyzes the effects of BPR on CIM in three aspects: production process, organizational structure and information technology. Proposes that the aims of CIM based on BPR are designing of customer‐oriented production process, creating of teamwork‐centered and flexible organization consisting of some from market‐to‐market process chains and building of distributed, simplified and integrated supporting information system.

[1]  N. Venkatraman,et al.  Beyond business process redesign: redefining Baxter's business network. , 1992, Sloan management review.

[2]  M. Hammer,et al.  REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .

[3]  Thomas H. Davenport,et al.  Process Innovation: Reengineering Work Through Information Technology , 1992 .

[4]  P. Ahmed,et al.  International approaches to computer‐integrated manufacturing perspectives from Europe and Japan , 1995 .

[5]  William J. Kettinger,et al.  BUSINESS PROCESS REENGINEERING: Building a Comprehensive Methodology , 1993 .

[6]  Mohamed Zairi The integration of benchmarking and BPR , 1995 .

[7]  Thomas F. Burgess,et al.  Making the Leap to Agility , 1994 .

[8]  H. Harrington,et al.  Improving business processes , 1991 .

[9]  Richard Archer,et al.  BPR consulting: an evaluation of the methods employed , 1995 .

[10]  Oswald Jones,et al.  The Introduction of CIM: A Strategic Analysis , 1994 .

[11]  R. Talwar Business re-engineering—a strategy-driven approach , 1993 .

[12]  Stephen J. Childe,et al.  Frameworks for Understanding Business Process Re‐engineering , 1994 .

[13]  Chris Edwards,et al.  Forging a link between business strategy and business reengineering , 1994 .

[14]  T. Davenport Need radical innovation and continuous improvement? Integrate process reengineering and TQM , 1993 .

[15]  Olugbenga Mejabi An Exploration of Concepts in System Integration , 1994 .

[16]  John Macdonald Together TQM and BPR are winners , 1995 .

[17]  Richard J. Murray,et al.  Getting ready for strategic change: surviving business process redesign , 1993 .

[18]  J. Heineke,et al.  Business Process Reengineering: Improving in New Strategic Directions , 1994 .