An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown
暂无分享,去创建一个
[1] Lotfi Tadj,et al. Optimal control of a production inventory system with deteriorating items , 2006, Int. J. Syst. Sci..
[2] Hui-Ming Wee,et al. An inventory model for ameliorating and deteriorating items taking account of time value of money and finite planning horizon , 2008, Int. J. Syst. Sci..
[3] Singa Wang Chiu,et al. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns , 2007, Eur. J. Oper. Res..
[4] D. N. P. Murthy,et al. Optimal lot sizing with unreliable production system , 2000 .
[5] Ali Gharbi,et al. Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems , 2007 .
[6] C. Chung,et al. Economic production quantity model for deteriorating inventory with random machine unavailability and shortage , 2011 .
[7] Y.-C. Chen,et al. Optimal inspection and economical production quantity strategy for an imperfect production process , 2006, Int. J. Syst. Sci..
[8] Hui-Ming Wee,et al. A hybrid of monopoly and perfect competition model for hi-tech products , 2010, Int. J. Syst. Sci..
[9] Nadim E. Abboud. A simple approximation of the EMQ model with Poisson machine failures , 1997 .
[10] Dah-Chuan Gong,et al. On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time , 2006, Math. Comput. Model..
[11] Sami El-Ferik,et al. Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy , 2008, Eur. J. Oper. Res..
[12] Chang Hyun Kim,et al. An extended EMQ model for a failure prone machine with general lifetime distribution , 1997 .
[13] Syed Naveed Khursheed,et al. Integrating quality and maintenance decisions in a production-inventory model for deteriorating items , 2005 .
[14] Jinn-Tsair Teng,et al. Economic production quantity models for deteriorating items with price- and stock-dependent demand , 2005, Comput. Oper. Res..
[15] Tadashi Dohi,et al. Computational aspects of an extended EMQ model with variable production rate , 2005, Comput. Oper. Res..
[16] Russell D. Meller,et al. The impact of preventive maintenance on system cost and buffer size , 1996 .
[17] Yuan-Shyi Peter Chiu,et al. A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns" , 2007, Eur. J. Oper. Res..
[18] Hui-Ming Wee,et al. Economic production lot size model for deteriorating items with partial back-ordering , 1993 .
[19] Mohamad Y. Jaber,et al. Economic lot sizing with the consideration of random machine unavailability time , 2000, Comput. Oper. Res..
[20] Seyyed M. T. Fatemi Ghomi,et al. An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages , 2009, Int. J. Syst. Sci..
[21] Hui-Ming Wee,et al. An integrated production-inventory deteriorating model for pricing policy considering imperfect production, inspection planning and warranty-period- and stock-level-dependant demand , 2008, Int. J. Syst. Sci..
[22] N. E. Abboud. A discrete-time Markov production-inventory model with machine breakdowns , 2001 .
[23] Caroline Sayde. Production lot sizing with machine breakdowns a simulation study - by Caroline Sayde , 1993 .
[24] Shey-Huei Sheu,et al. Optimal lot-sizing problem with imperfect maintenance and imperfect production , 2004, Int. J. Syst. Sci..
[25] H. M. Wee. OPTIMAL PRODUCTION POLICY FOR PERISHABLE ITEMS WITH PARTIAL BACKORDERING , 1995 .
[26] Hui-Ming Wee,et al. Determining the optimal number of Kanban in multi-products supply chain system , 2010, Int. J. Syst. Sci..
[27] El Houssaine Aghezzaf,et al. An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..
[28] Yan-Chun Chen,et al. An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length , 2009, Int. J. Syst. Sci..
[29] R. Misra,et al. Optimum production lot size model for a system with deteriorating inventory , 1975 .
[30] Yuan-Shyi Peter Chiu,et al. Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time , 2008 .
[31] Jia-Chi Tsou,et al. The impact of preventive activities on the economics of production systems : Modeling and application , 2008 .