An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown

In recent years, many researches on economic production quantity (EPQ) models with machine breakdown and preventive maintenance have been developed, but few of them have developed integrated models for deteriorating items. In this study, we develop EPQ models for deteriorating items with preventive maintenance, random machine breakdown and immediate corrective action. Corrective and preventive maintenance times are assumed to be stochastic and the unfulfilled demands are lost sales. Two EPQ models of uniform distribution and exponential distribution of corrective and maintenance times are developed. An example and sensitivity analysis is given to illustrate the models. For the exponential distribution model, it is shown that the corrective time parameter is one of the most sensitive parameters to the optimal total cost.

[1]  Lotfi Tadj,et al.  Optimal control of a production inventory system with deteriorating items , 2006, Int. J. Syst. Sci..

[2]  Hui-Ming Wee,et al.  An inventory model for ameliorating and deteriorating items taking account of time value of money and finite planning horizon , 2008, Int. J. Syst. Sci..

[3]  Singa Wang Chiu,et al.  Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns , 2007, Eur. J. Oper. Res..

[4]  D. N. P. Murthy,et al.  Optimal lot sizing with unreliable production system , 2000 .

[5]  Ali Gharbi,et al.  Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems , 2007 .

[6]  C. Chung,et al.  Economic production quantity model for deteriorating inventory with random machine unavailability and shortage , 2011 .

[7]  Y.-C. Chen,et al.  Optimal inspection and economical production quantity strategy for an imperfect production process , 2006, Int. J. Syst. Sci..

[8]  Hui-Ming Wee,et al.  A hybrid of monopoly and perfect competition model for hi-tech products , 2010, Int. J. Syst. Sci..

[9]  Nadim E. Abboud A simple approximation of the EMQ model with Poisson machine failures , 1997 .

[10]  Dah-Chuan Gong,et al.  On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time , 2006, Math. Comput. Model..

[11]  Sami El-Ferik,et al.  Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy , 2008, Eur. J. Oper. Res..

[12]  Chang Hyun Kim,et al.  An extended EMQ model for a failure prone machine with general lifetime distribution , 1997 .

[13]  Syed Naveed Khursheed,et al.  Integrating quality and maintenance decisions in a production-inventory model for deteriorating items , 2005 .

[14]  Jinn-Tsair Teng,et al.  Economic production quantity models for deteriorating items with price- and stock-dependent demand , 2005, Comput. Oper. Res..

[15]  Tadashi Dohi,et al.  Computational aspects of an extended EMQ model with variable production rate , 2005, Comput. Oper. Res..

[16]  Russell D. Meller,et al.  The impact of preventive maintenance on system cost and buffer size , 1996 .

[17]  Yuan-Shyi Peter Chiu,et al.  A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns" , 2007, Eur. J. Oper. Res..

[18]  Hui-Ming Wee,et al.  Economic production lot size model for deteriorating items with partial back-ordering , 1993 .

[19]  Mohamad Y. Jaber,et al.  Economic lot sizing with the consideration of random machine unavailability time , 2000, Comput. Oper. Res..

[20]  Seyyed M. T. Fatemi Ghomi,et al.  An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages , 2009, Int. J. Syst. Sci..

[21]  Hui-Ming Wee,et al.  An integrated production-inventory deteriorating model for pricing policy considering imperfect production, inspection planning and warranty-period- and stock-level-dependant demand , 2008, Int. J. Syst. Sci..

[22]  N. E. Abboud A discrete-time Markov production-inventory model with machine breakdowns , 2001 .

[23]  Caroline Sayde Production lot sizing with machine breakdowns a simulation study - by Caroline Sayde , 1993 .

[24]  Shey-Huei Sheu,et al.  Optimal lot-sizing problem with imperfect maintenance and imperfect production , 2004, Int. J. Syst. Sci..

[25]  H. M. Wee OPTIMAL PRODUCTION POLICY FOR PERISHABLE ITEMS WITH PARTIAL BACKORDERING , 1995 .

[26]  Hui-Ming Wee,et al.  Determining the optimal number of Kanban in multi-products supply chain system , 2010, Int. J. Syst. Sci..

[27]  El Houssaine Aghezzaf,et al.  An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..

[28]  Yan-Chun Chen,et al.  An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length , 2009, Int. J. Syst. Sci..

[29]  R. Misra,et al.  Optimum production lot size model for a system with deteriorating inventory , 1975 .

[30]  Yuan-Shyi Peter Chiu,et al.  Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time , 2008 .

[31]  Jia-Chi Tsou,et al.  The impact of preventive activities on the economics of production systems : Modeling and application , 2008 .