Contract design for equipment after-sales service with business interruption insurance

Abstract After-sales service is strategically important for mission-critical equipment due to the high operational risks involved (e.g., machine breakdowns). To address this challenge, the operators of such equipment often purchase business interruption (BI) insurance to mitigate operational risks. In this paper, we develop a principal-agent model to study an after-sales service contracting problem with an insurance option. Two prevailing contract forms are considered: a resource-based contract (RBC) and a performance-based contract (PBC). We first show that, in the presence of insurance, a PBC outperforms an RBC in terms of system performance due to the skewed incentives inherent in an RBC. More important, our results show that insurance plays contrasting roles in incentivizing a service supplier under the two contracting mechanisms. Under an RBC, insurance improves the service supplier’s effort provision and hence benefits the operator because insurance provides a risk-sharing mechanism that better aligns the incentives of the service supplier and the operator. Under a PBC, although the supplier’s equilibrium effort remains at the first-best level regardless of the insurance coverage level, the use of insurance changes the operator’s optimal contract and the risk allocation between the operator and the supplier. Our findings provide important insights into the interplay of insurance and contract incentives in an after-sales service context.

[1]  Stephan M. Wagner,et al.  Zurich Insurance Uses Data Analytics to Leverage the BI Insurance Proposition , 2018, Interfaces.

[2]  Matthieu van der Heijden,et al.  Trade-off between inventory and repair capacity in spare part networks , 2003, J. Oper. Res. Soc..

[3]  Sang-Hyun Kim,et al.  Guilt by Association : Strategic Failure Prevention and Recovery Capacity Investments , 2011 .

[4]  Serguei Netessine,et al.  Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis , 2011, Manag. Sci..

[5]  Rajesh Piplani,et al.  A study of repairable parts inventory system operating under performance-based contract , 2011, Eur. J. Oper. Res..

[6]  Uday S. Karmarkar,et al.  Contracting for Collaborative Services , 2008, Manag. Sci..

[7]  Finn Wynstra,et al.  Performance-based contracting: a literature review and future research directions , 2015 .

[8]  Geert-Jan van Houtum,et al.  Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..

[9]  Tongdan Jin,et al.  Spare parts inventory control considering stochastic growth of an installed base , 2009, Comput. Ind. Eng..

[10]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .

[11]  Geert-Jan van Houtum,et al.  Spare Parts Inventory Control under System Availability Constraints , 2015 .

[12]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[13]  J. Muckstadt A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .

[14]  Dirk Cattrysse,et al.  Stocking decisions for repairable spare parts pooling in a multi-hub system , 2005 .

[15]  Craig C. Sherbrooke,et al.  VARI-METRIC: Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models , 1986, Oper. Res..

[16]  Ralph A. Winter Optimal Insurance under Moral Hazard , 2000 .

[17]  Dinesh Verma,et al.  A GOAL PROGRAMMING MODEL FOR OPTIMIZING RELIABILITY, MAINTAINABILITY AND SUPPORTABILITY UNDER PERFORMANCE BASED LOGISTICS , 2007 .

[18]  Mustafa Akan,et al.  Asymmetric Information and Economies of Scale in Service Contracting , 2011, Manuf. Serv. Oper. Manag..

[19]  Louis Kaplow Income Tax Deductions for Losses as Insurance , 1992 .

[20]  G. J. Feeney,et al.  The S-1, S Inventory Policy Under Compound Poisson Demand , 1966 .

[21]  Bin Shen,et al.  Service supply chain management: A review of operational models , 2015, Eur. J. Oper. Res..

[22]  Paul H. Zipkin,et al.  Foundations of Inventory Management , 2000 .

[23]  Serguei Netessine,et al.  Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems , 2010, Manag. Sci..

[24]  Vinit Parida,et al.  Risk management for product-service system operation , 2016 .

[25]  Sammi Y. Tang,et al.  Production Chain Disruptions: Inventory, Preparedness, and Insurance , 2018 .

[26]  Harish Krishnan,et al.  The Strategic Role of Business Insurance , 2015 .

[27]  Ronald Gleich,et al.  Clarifying the concept of performance‐based contracting in manufacturing industries , 2010 .

[28]  Serguei Netessine,et al.  Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..

[29]  R. Pascual,et al.  A methodology for integrated critical spare parts and insurance management , 2016 .

[30]  Sang-Hyun Kim,et al.  Reliability or Inventory? An Analysis of Performance-Based Contracts for Product Support Services , 2015 .

[31]  Yongjian Li,et al.  Transportation disruption risk management: business interruption insurance and backup transportation , 2016 .

[32]  Sang-Hyun Kim,et al.  Signaling New Product Reliability with After-Sales Service Contracts , 2015, Manag. Sci..

[33]  Nitish Jain,et al.  Optimal Contracts for Outsourcing of Repair and Restoration Services , 2013 .

[34]  Ruud H. Teunter,et al.  Inventory models with lateral transshipments: A review , 2011, Eur. J. Oper. Res..

[35]  Min Xie,et al.  A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting , 2015 .

[36]  Yu Tian,et al.  Optimizing reliability and service parts logistics for a time-varying installed base , 2012, Eur. J. Oper. Res..

[37]  John A. Muckstadt,et al.  Analysis and Algorithms for Service Parts Supply Chains , 2008 .

[38]  Kostas Selviaridis,et al.  Performance-based contracting in service supply chains: a service provider risk perspective , 2014 .

[39]  Lingxiu Dong,et al.  Managing Disruption Risk: The Interplay Between Operations and Insurance , 2012, Manag. Sci..

[40]  Ronald Gleich,et al.  Benefits and uncertainties of performance‐based contracting in manufacturing industries , 2010 .