Transmission planning risk assessment

Transmission planning in todaypsilas deregulated electric power systems should, at best, include a vigorous treatment of risk. Given that risk is the product of the likelihood of an event and the associated consequence (monetary or otherwise), it is present at every stage of the transmission expansion process - from the load forecast all the way to construction. Identification of risk factors at each stage of the transmission planning process, its likelihood and associated consequence is therefore critical, and necessary, in reaping maximum benefit. This paper provides a practical application of the inclusion of risk, based on the widely accepted Australia-New Zealand (AU-NZ) Risk Model, into the transmission planning process at Bonneville Power Administration (BPA) - a federal government agency that owns and operates the backbone of the electrical network of the US Pacific Northwest.

[1]  A. Eydeland Energy and Power Risk Management , 2002 .

[2]  J.P. Buechler Transmission planning in a market-based environment , 2005, IEEE Power Engineering Society General Meeting, 2005.

[3]  Y. V. Makarov,et al.  On risk-based indices for transmission systems , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).

[4]  Mohammad Shahidehpour,et al.  Market operations in electric power systems , 2002 .

[5]  Feng Gao,et al.  Overview of transmission expansion planning using real options analysis , 2005 .

[6]  Zuyi Li,et al.  Market Operations in Electric Power Systems : Forecasting, Scheduling, and Risk Management , 2002 .

[7]  M. Madrigal,et al.  Centralized vs. competitive transmission expansion planning: the need for new tools , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).

[8]  Mohammad Shahidehpour,et al.  Transmission planning approaches in restructured power systems , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.

[9]  Ralph Masiello,et al.  Exploring Risk-Based Approaches for ISO/RTO Asset Managers , 2005, Proceedings of the IEEE.

[10]  J. Perera,et al.  An integrated risk management tool and process , 2005, 2005 IEEE Aerospace Conference.

[11]  G. Latorre,et al.  Classification of publications and models on transmission expansion planning , 2003 .