Approximation algorithms for the three-stage flexible flow shop problem with mid group constraint
暂无分享,去创建一个
Zhan-tao Li | Qing-xin Chen | Jianjun Liu | Ning Mao | Xiaoming Wang | Xiaoming Wang | Qing-xin Chen | N. Mao | Zhan-tao Li | Jianjun Liu | Zhantao Li
[1] George L. Vairaktarakis,et al. Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..
[2] Rasaratnam Logendran,et al. Minimizing the makespan of a group scheduling problem: a new heuristic , 1991 .
[3] Shaukat A. Brah,et al. Heuristics for scheduling in a flow shop with multiple processors , 1999, Eur. J. Oper. Res..
[4] Geun-Cheol Lee,et al. Estimating order lead times in hybrid flowshops with different scheduling rules , 2009, Comput. Ind. Eng..
[5] Rasaratnam Logendran,et al. Group scheduling in flexible flow shops , 2005 .
[6] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[7] Zhan-tao Li,et al. Scheduling Rules for Two-stage Flexible Flow Shop Scheduling Problem Subject to Tail Group Constraint. , 2013 .
[8] Stéphane Dauzère-Pérès,et al. Modelling and solving a practical flexible job-shop scheduling problem with blocking constraints , 2011 .
[9] Oscar H. Ibarra,et al. Bounds for LPT Schedules on Uniform Processors , 1977, SIAM J. Comput..
[10] Ronald G. Askin,et al. Scheduling flexible flow lines with sequence-dependent setup times , 2004, Eur. J. Oper. Res..
[11] Ronald L. Graham,et al. Bounds for certain multiprocessing anomalies , 1966 .
[12] Zhan-tao Li,et al. A heuristic algorithm for two-stage flexible flow shop scheduling with head group constraint , 2013 .
[13] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[14] Heinrich Kuhn,et al. A taxonomy of flexible flow line scheduling procedures , 2007, Eur. J. Oper. Res..
[15] Reza Tavakkoli-Moghaddam,et al. A memetic algorithm for the flexible flow line scheduling problem with processor blocking , 2009, Comput. Oper. Res..
[16] Christos Koulamas,et al. A note on performance guarantees for sequencing three-stage flexible flowshops with identical machines to minimize makespan , 2007 .
[17] Shaukat A. Brah,et al. Comparison of Scheduling Rules in a Flow Shop with Multiple Processors: A Simulation , 1998, Simul..
[18] Salah E. Elmaghraby,et al. Sequencing Three-Stage Flexible Flowshops with Identical Machines to Minimize Makespan , 2001 .
[19] T. T. Narendran,et al. Buffer levels and choice of material handling device in flexible manufacturing systems , 1993 .
[20] Hong Wang,et al. Flexible flow shop scheduling: optimum, heuristics and artificial intelligence solutions , 2005, Expert Syst. J. Knowl. Eng..
[21] Frank Werner,et al. A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria , 2009, Comput. Oper. Res..
[22] Luo Runzi. Two-stage Flexible Flowshop Scheduling Problems with a Batch Processor on Second Stage , 2008 .
[23] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[24] Rubén Ruiz,et al. The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[25] Marius M. Solomon,et al. A computational study of heuristics for two-stage flexible flowshops , 1996 .
[26] Shaukat A. Brah,et al. A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors , 1996 .
[27] Giorgio Gambosi,et al. Complexity and Approximation , 1999, Springer Berlin Heidelberg.
[28] Mostafa Zandieh,et al. Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis , 2010 .
[29] Teofilo F. Gonzalez,et al. Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..