Set-up saving schemes for printed circuit boards assembly
暂无分享,去创建一个
[1] Jim Browne,et al. A LISP-based heuristic scheduler for automatic insertion in electronics assembly , 1986 .
[2] Oded Maimon,et al. Group set-up for printed circuit board assembly , 1989 .
[3] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[4] J. A. Esrom. Semi-Custom IC Design and VLSI edited by P. J. Hicks Peter Peregrinus, London, 1983, xii + 218 pp., index (£12.50 in the UK, £16.00 elsewhere) , 1984, Robotica.
[5] Yahya Fathi,et al. A mathematical model for loading the sequencers in a printed circuit pack manufacturing environment , 1989 .
[6] C. S. Tang. A job scheduling model for a flexible manufacturing machine , 1986, Proceedings. 1986 IEEE International Conference on Robotics and Automation.
[7] J. G. Wager,et al. Set-up times in cyclic and acyclic Group Technology Scheduling systems , 1983 .
[8] Lawrence Bodin,et al. Approximate Traveling Salesman Algorithms , 1980, Oper. Res..
[9] Nicos Christofides. Worst-Case Analysis of a New Heuristic for the Travelling Salesman Problem , 1976, Operations Research Forum.
[10] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[11] Tien-Chien Chang,et al. A rule based system for printed wiring assembly process planning , 1987 .
[12] Brian W. Kernighan,et al. An Effective Heuristic Algorithm for the Traveling-Salesman Problem , 1973, Oper. Res..
[13] Vangelis F. Magirou. The Efficient Drilling of Printed Circuit Boards , 1986 .
[14] Leon F. McGinnis,et al. Soft configuration in automated insertion , 1986, Proceedings. 1986 IEEE International Conference on Robotics and Automation.
[15] F. R. Furth. A message from rear admiral , 1954 .
[16] Andrew Kusiak,et al. Grouping problem in scheduling flexible manufacturing systems , 1985, Robotica.