Case Study on the Evaluation of Equipment Flow at a Construction Site

The purpose of this study is to evaluate the effects of traffic flow of construction equipment. A large construction project requires large quantities of construction equipment. This volume can result in traffic congestion in the flow of construction equipment, which also lowers the overall efficiency of construction operations. In particular, this effect can be serious in the area where traffic bottlenecks are most likely. This study applies a multiagent-based simulation modeling approach to a real project. Through a case study, this study evaluates how traffic flow of construction equipment influences the efficiency of that equipment in construction operations and, moreover, the schedule of a project.

[1]  G. Edward Gibson,et al.  Interactive simulation modeling for heavy construction operations , 2003 .

[2]  Lei Rao,et al.  Traffic flow simulation using CORSIM , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[3]  Ian F. C. Smith,et al.  SENSORS, MODELS AND VIDEOTAPE , 2005 .

[4]  Iris D. Tommelein,et al.  Assembly of Simulation Networks Using Designs, Plans, and Methods , 1994 .

[5]  Hong Zhang,et al.  Activity Object-Oriented Simulation Strategy for Modeling Construction Operations , 2005 .

[6]  Nashwan Dawood,et al.  ROADSIM: SIMULATION MODELLING APPLIED TO ROAD CONSTRUCTION , 2005 .

[7]  Helbing,et al.  Congested traffic states in empirical observations and microscopic simulations , 2000, Physical review. E, Statistical physics, plasmas, fluids, and related interdisciplinary topics.

[8]  J M Morales,et al.  ANALYTICAL PROCEDURES FOR ESTIMATING FREEWAY TRAFFIC CONGESTION , 1986 .

[9]  Hong Zhang,et al.  Iconic Animation for Activity-based Construction Simulation , 2002 .

[10]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .

[11]  Robert I. Carr CONSTRUCTION CONGESTION COST (CO3) BASIC MODEL , 2000 .

[12]  Eul-Bum Lee,et al.  Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies , 2005 .

[13]  Jeffery Raphael Roesler,et al.  CONSTRUCTABILITY AND PRODUCTIVITY ANALYSIS FOR LONG LIFE PAVEMENT REHABILITATION STRATEGIES , 2001 .

[14]  Photios G. Ioannou,et al.  Graphical Object-Oriented Simulation System for Construction Process Modeling , 1992 .

[15]  Haldun Cor,et al.  A case study in the quantification of a change in the conditions of a highway construction operation , 1999, WSC '99.

[16]  Simaan M. AbouRizk,et al.  Application Framework for Development of Simulation Tools , 2000 .

[17]  Kyong Ju Kim Simplified discrete event simulation for heavy construction operations , 1997 .

[18]  Simaan M. AbouRizk,et al.  Unified Modeling Methodology for Construction Simulation , 2002 .

[19]  Mitsuru Saito,et al.  Automated estimation of average stopped delay at signalized intersections using digitized still-image analysis of actual traffic flow , 2006 .

[20]  Jonathan Jingsheng Shi,et al.  ACTIVITY-BASED CONSTRUCTION (ABC) MODELING AND SIMULATION METHOD , 1999 .

[21]  Photios G. Ioannou,et al.  General-purpose systems for effective construction simulation , 1999 .