Integer fuzzy credibility constrained programming for power system management

In this study, an environmentally friendly model of regional power system was developed to minimize the total cost of a regional power system consisting of an independent power grid. SO2 emission is controlled and capacity expansion is scheduled. In the system, the deterministic variables represent the power supplied from different energy conversion facilities. The binary variables refer to expansions for electricity conversion facilities, with three options given to each technology. To solve this model, an integer credibility constrained programming (ICCP) is developed by incorporating the concepts of credibility based chance constrained programming and mixed integer programming within an optimization framework. ICCP can explicitly address planning problems and systematic uncertainties without unrealistic simplifications. In application, a comparative benefit motivated electricity production system is proposed without SO2 control. Results of two cases are compared which show significant effect of emission control. By setting different credibility levels in constraints, it is able to find that the higher the credibility of energy supply satisfying the needs and total SO2 emission being less than its allowance, and the higher the total energy and lower coal-fired electricity supplies, the higher the total operational costs.

[1]  Jin-Won Park,et al.  Economic comparison between coal-fired and liquefied natural gas combined cycle power plants considering carbon tax: Korean case , 2008 .

[2]  F. N. Lee,et al.  Interactive search approach to emission constrained dispatch , 1997 .

[3]  Guohe Huang,et al.  Inexact credibility constrained programming for environmental system management , 2011 .

[4]  Charles O.P. Marpaung,et al.  Supply- and demand-side effects of power sector planning with demand-side management options and SO2 emission constraints , 2005 .

[5]  Suthathip Yaisawarng,et al.  The Effects of Sulfur Dioxide Controls on Productivity Change in the U.S. Electric Power Industry , 1994 .

[6]  Lalit Goel,et al.  Power system planning — a reliability perspective , 1995 .

[7]  Ni-Bin Chang,et al.  Optimal planning of co-firing alternative fuels with coal in a power plant by grey nonlinear mixed integer programming model. , 2008, Journal of environmental management.

[8]  Guohe Huang,et al.  Optimal water resource planning under fixed budget by interval-parameter credibility constrained programming , 2011 .

[9]  Guohe Huang,et al.  Fuzzy Robust Credibility-Constrained Programming for Environmental Management and Planning , 2010, Journal of the Air & Waste Management Association.

[10]  Benjamin F. Hobbs Emissions dispatch under the underutilization provision of the 1990 US Clean Air Act Amendments: models and analysis , 1993 .

[11]  Benjamin F. Hobbs,et al.  Optimization methods for electric utility resource planning , 1995 .

[12]  Yian-Kui Liu,et al.  Expected value of fuzzy variable and fuzzy expected value models , 2002, IEEE Trans. Fuzzy Syst..

[13]  Milos Pantos,et al.  Market-based congestion management in electric power systems with increased share of natural gas dep , 2011 .

[14]  W. Cooper,et al.  Survey of mathematical programming models in air pollution management , 1997 .