Variation Modeling of Lean Manufacturing Performance Using Fuzzy Logic Based Quantitative Lean Index

Abstract The lean index is the sum of weighted scores of performance variables that describe the lean manufacturing characteristics of a system. Various quantitative lean index models have been advanced for assessing lean manufacturing performance. These models are represented by deterministic variables and do not consider variation in manufacturing systems. In this article variation is modeled in a quantitative fuzzy logic based lean index and compared with traditional deterministic modeling. By simulating the lean index model for a manufacturing case it is found that the latter tend to under or overestimate performance and the former provides a more robust lean assessment.

[1]  S. Vinodh,et al.  Fuzzy logic based leanness assessment and its decision support system , 2011 .

[2]  Charles David Ray,et al.  THE LEAN INDEX: OPERATIONAL "LEAN" METRICS FOR THE WOOD PRODUCTS INDUSTRY , 2007 .

[3]  S. Vinodh,et al.  Scoring and multi-grade fuzzy assessment of agility in an Indian electric automotive car manufacturing organisation , 2012 .

[4]  Konstantinos Salonitis,et al.  Improving the efficacy of the lean index through the quantification of qualitative lean metrics , 2015 .

[5]  Hung-da Wan,et al.  A leanness measure of manufacturing systems for quantifying impacts of lean initiatives , 2008 .

[6]  Marcello Braglia,et al.  Uncertainty in value stream mapping analysis , 2009 .

[7]  Robert LIN,et al.  NOTE ON FUZZY SETS , 2014 .

[8]  Kuan Yew Wong,et al.  Lean performance evaluation of manufacturing systems: A dynamic and innovative approach , 2011, WCIT.

[9]  Suresh Garg,et al.  Development of index for measuring leanness: study of an Indian auto component industry , 2010 .

[10]  Fatma Pakdil,et al.  Criteria for a lean organisation: development of a lean assessment tool , 2014 .

[11]  Rick L. Wilson,et al.  Describing processing time when simulating JIT environments , 1992 .

[12]  A. de Korvin,et al.  Measuring the leanness of manufacturing systems-A case study of Ford Motor Company and General Motors , 2008 .

[13]  Kenneth H. Doerr,et al.  A Performance Metric and Goal-Setting Procedure for Deadline-Oriented Processes , 2013 .

[14]  Carl E. Betterton,et al.  Production rate of synchronous transfer lines using Monte Carlo simulation , 2012 .

[15]  Lotfi A. Zadeh,et al.  Fuzzy Algorithms , 1968, Inf. Control..

[16]  DeWayne L. Searcy Developing a Lean Performance Score , 2009 .

[17]  Marcello Braglia,et al.  Stochastic overall equipment effectiveness , 2011 .

[18]  Samuel Kotz,et al.  The cycle time distribution , 2008 .