A metaheuristic scheduling procedure for resource‐constrained projects with cash flows
暂无分享,去创建一个
[1] Rema Padman,et al. Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach , 1993 .
[2] James H. Patterson,et al. A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .
[3] Fred Glover,et al. Tabu search methods for a single machine scheduling problem , 1991, J. Intell. Manuf..
[4] Robert A. Russell,et al. A comparison of heuristics for scheduling projects with cash flows and resource restrictions , 1986 .
[5] S. Selcuk Erenguc,et al. A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows , 1994 .
[6] Rema Padman,et al. Heuristic scheduling of resource‐constrained projects with cash flows , 1997 .
[7] Rema Padman,et al. Connectionist approaches for solver selection in constrained project scheduling , 1997, Ann. Oper. Res..
[8] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[9] Sami M. Baroum,et al. The development of cash flow weight procedures for maximizing the net present value of a project , 1996 .
[10] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[11] Fred Glover,et al. Tabu Search - Part II , 1989, INFORMS J. Comput..