전차선 압상 검측을 위한 시스템 기술

The measurement of contact wire uplift in electric railway is one of the most test method to accept the maximum permitted speed of new vehicles or pantographs. The contact wire uplift can be measured for shot periods when pantograph is running in monitoring station. This paper describes the development of two different methods for contact uplift measurement using vision-based system and wireless online monitoring system. Our vision-based system employs a high-speed CMOS (Complementary Metal Oxide Semiconductor) camera with gigabit ethernet LAN. The development of a real-time remote monitoring system that acquires data from any kind of sensor to be transmitted by wireless communication from overhead line and structure at 25 kV to a computer in catenary system. The proposed two kind of different measurement systems to evaluation for dynamic uplift of overhead contact wire shows promising on-field applications for high speed train such as Korea Tilting Train (TTX) and Korea Train eXpress (KTX).