Stochastic Modeling and Profit Evaluation of a Redundant System with Priority Subject to Weibull Densities for Failure and Repair

[1]  Hoang Pham,et al.  Reliability and Cost-Benefit Analysis for Two-Stage Intervened Decision-Making Systems with Interdependent Decision Units , 2019 .

[2]  Mangey Ram,et al.  Reliability Measures of Two Dissimilar Units Parallel System Using Gumbel-Hougaard Family Copula , 2019 .

[3]  Ashish Kumar,et al.  Stochastic Modeling of a Single-Unit System Operating Under Different Environmental Conditions Subject to Inspection and Degradation , 2020 .

[4]  Tadashi Dohi,et al.  Reliability Importance of Components in a Real-Time Computing System with Standby Redundancy Schemes , 2018 .

[5]  Ashish Kumar,et al.  Stochastic modeling of non-identical redundant systems with priority, preventive maintenance, and Weibull failure and repair distributions , 2018 .

[6]  Monika Saini,et al.  Analysis of some reliability measures of single-unit systems subject to abnormal environmental conditions and arbitrary distribution for failure and repair activities , 2018 .

[7]  James Li,et al.  Reliability Comparative Evaluation of Active Redundancy vs. Standby Redundancy , 2016 .

[8]  Divya Jain,et al.  Classical and Bayesian analysis of reliability characteristics of a two-unit parallel system with Weibull failure and repair laws , 2014, Int. J. Syst. Assur. Eng. Manag..

[9]  Ashish Kumar Reliability Modelling of a Computer System with Priority to H/W Repair over Replacement of H/W and Up-gradation of S/W Subject to MOT and MRT , 2014 .

[10]  Rakesh Gupta,et al.  Cost benefit analysis of a two dissimilar unit cold standby system with Weibull failure and repair laws , 2013, Int. J. Syst. Assur. Eng. Manag..

[11]  Mangey Ram,et al.  Stochastic Analysis of a Standby System With Waiting Repair Strategy , 2013, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[12]  S. C. Malik,et al.  Stochastic Analysis of a Repairable System of Non- identical Units with Priority for Operation and Repair Subject to Weather Conditions , 2012 .

[13]  Mangey Ram,et al.  AVAILABILITY AND COST ANALYSIS OF A PARALLEL REDUNDANT COMPLEX SYSTEM WITH TWO TYPES OF FAILURE UNDER PREEMPTIVE-RESUME REPAIR DISCIPLINE USING GUMBEL-HOUGAARD FAMILY COPULA IN REPAIR , 2008 .