Stochastic Modeling and Profit Evaluation of a Redundant System with Priority Subject to Weibull Densities for Failure and Repair
暂无分享,去创建一个
[1] Hoang Pham,et al. Reliability and Cost-Benefit Analysis for Two-Stage Intervened Decision-Making Systems with Interdependent Decision Units , 2019 .
[2] Mangey Ram,et al. Reliability Measures of Two Dissimilar Units Parallel System Using Gumbel-Hougaard Family Copula , 2019 .
[3] Ashish Kumar,et al. Stochastic Modeling of a Single-Unit System Operating Under Different Environmental Conditions Subject to Inspection and Degradation , 2020 .
[4] Tadashi Dohi,et al. Reliability Importance of Components in a Real-Time Computing System with Standby Redundancy Schemes , 2018 .
[5] Ashish Kumar,et al. Stochastic modeling of non-identical redundant systems with priority, preventive maintenance, and Weibull failure and repair distributions , 2018 .
[6] Monika Saini,et al. Analysis of some reliability measures of single-unit systems subject to abnormal environmental conditions and arbitrary distribution for failure and repair activities , 2018 .
[7] James Li,et al. Reliability Comparative Evaluation of Active Redundancy vs. Standby Redundancy , 2016 .
[8] Divya Jain,et al. Classical and Bayesian analysis of reliability characteristics of a two-unit parallel system with Weibull failure and repair laws , 2014, Int. J. Syst. Assur. Eng. Manag..
[9] Ashish Kumar. Reliability Modelling of a Computer System with Priority to H/W Repair over Replacement of H/W and Up-gradation of S/W Subject to MOT and MRT , 2014 .
[10] Rakesh Gupta,et al. Cost benefit analysis of a two dissimilar unit cold standby system with Weibull failure and repair laws , 2013, Int. J. Syst. Assur. Eng. Manag..
[11] Mangey Ram,et al. Stochastic Analysis of a Standby System With Waiting Repair Strategy , 2013, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[12] S. C. Malik,et al. Stochastic Analysis of a Repairable System of Non- identical Units with Priority for Operation and Repair Subject to Weather Conditions , 2012 .
[13] Mangey Ram,et al. AVAILABILITY AND COST ANALYSIS OF A PARALLEL REDUNDANT COMPLEX SYSTEM WITH TWO TYPES OF FAILURE UNDER PREEMPTIVE-RESUME REPAIR DISCIPLINE USING GUMBEL-HOUGAARD FAMILY COPULA IN REPAIR , 2008 .