Estimating Agency Cost of Maintenance, Repair, and Rehabilitation for Florida Bridges
暂无分享,去创建一个
[1] Ralph Haas,et al. Pavement and Bridge Cost Allocation Analysis of the Ontario, Canada, Intercity Highway Network , 2000 .
[2] R Ellis,et al. THE NEW ONTARIO BRIDGE MANAGEMENT SYSTEM , 1999 .
[3] B R Appleman. LEAD-BASED PAINT REMOVAL FOR STEEL HIGHWAY BRIDGES , 1997 .
[4] Teresa M. Adams,et al. Sensitivity of Network-Level BMS MR&R Policies to Variations in Cost, Transition Probability, and Discount Factor , 1998 .
[5] F Wayne Klaiber,et al. COST-EFFECTIVENESS ANALYSIS FOR STRENGTHENING EXISTING BRIDGES , 1987 .
[6] Richard E. Weyers,et al. COST RELATIONSHIPS FOR CONCRETE BRIDGE PROTECTION, REPAIR, AND REHABILITATION , 1995 .
[7] Van Lund. BRIDGE BEARING REPLACEMENT , 1995 .
[8] Imad J Abed-Al-Rahim,et al. BRIDGE REPLACEMENT COST ANALYSIS PROCEDURES , 1995 .
[9] H Ludescher,et al. DISTINCTIVE FEATURES OF THE SWISS ROAD STRUCTURES MANAGEMENT SYSTEM , 1999 .
[10] Teresa M Adams,et al. Establishing MR&R Costs for a Network-Level Bridge Management System , 1998 .
[11] John O Sobanjo. DEVELOPMENT OF AGENCY MAINTENANCE, REPAIR & REHABILITATION (MR&R) COST DATA FOR FLORIDA'S BRIDGE MANAGEMENT SYSTEM , 2001 .
[12] Michael J Markow,et al. COLLECTING AND MANAGING COST DATA FOR BRIDGE MANAGEMENT SYSTEMS , 1996 .
[13] InduShobha N. Chengalur-Smith,et al. Modeling the costs of bridge rehabilitation , 1997 .