The use of value-based priorities when early shipments are forbidden
暂无分享,去创建一个
[1] Larry R. Taube,et al. Time completion for various dispatching rules in job shops , 1983 .
[2] John J. Kankt,et al. Manufacturing systems with forbidden early order departure , 1984 .
[3] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[4] C. Jones. An Economic Evaluation of Job Shop Dispatching Rules , 1973 .
[5] Gary D. Scudder,et al. The use of cost-based priorities in random and flow shops , 1987 .
[6] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[7] Michael P. Hottenstein,et al. Expediting in Job-Order-Control Systems: A Simulation Study , 1970 .
[8] Jack A. Holt,et al. A heuristic method for aggregate planning: Production decision framework , 1981 .
[9] Ronald J. Ebert,et al. Search and Simulation Selection of a Job-Shop Sequencing Rule , 1975 .
[10] Jack C. Hayya,et al. Priority dispatching with operation due dates in a job shop , 1982 .
[11] Gary D. Scudder,et al. Priority scheduling with cost considerations , 1983 .
[12] Bruce A. McCarl,et al. The development and evaluation of a cost‐based composite scheduling rule , 1974 .
[13] Larry R. Taube,et al. Deterministic/stochastic assumptions in job shops , 1983 .