Taking Effective Delay Reduction Measures and Using Delay Elements as Indices for Tokyo’s Metropolitan Railways
暂无分享,去创建一个
In the Tokyo metropolitan area of Japan, several minutes of delays often happen during morning rush hour. This is because a massive number of passengers use trains for commuting. Then trains and platforms are congested. Above all, once a train delays due to increasing dwell time, the subsequent train has to wait outside a station or slow down if the platform is occupied by the preceding train. This process is repeated over and over again and delays increase more and more. So the authors had to identify how often or how large delays occur and take delay reduction measures, because it is pointless to blindly carry out delay reduction measures. The measures should be carried out effectively; otherwise investigations and running costs become high. In this paper, the authors introduce delay reduction measures and indices, which indicate the frequency of delays and the scale of delays.
[1] Rommert Dekker,et al. Stochastic Improvement of Cyclic Railway Timetables , 2006 .
[2] Malachy Carey,et al. Ex ante heuristic measures of schedule reliability , 1999 .
[3] T. Graffagnino. Ensuring timetable stability with train traffic data , 2012 .
[4] Norio Tomii,et al. Identification of causes of delays in urban railways , 2012 .