COMPARATIVE STUDY OF DIFFERENT CONTRACTOR SELECTION METHODS

Contractors are very important in construction projects for the completion of project and selection of the best contractor for the project is a crucial decision for clients or owner. Selecting the right contractor for the right project is the most crucial challenge for any construction clients. Selection of the contractor to whom the client can trust and give the responsibility to execute the project has been primarily on the basis of bid price alone and the lowest price (tender) is usually described as being the key to win the contract, despite the fact that the tender sum is a major consideration because of instability and competitiveness of the construction industry, the selection of lowest bidder is one of the major reason for project failures. Recently there has been a trend away from a lowest price wins principle and subjective judgments to a multi criteria selection approach. In the present study A Comparative Study of Different Contractor Selection Methods has been done. Multicriteria decision approach considers both price and nonprice related criteria’s for the selection of the contractor. Based on the past research done by the professionals the criteria’s are selected. The important criteria’s are listed out by survey for the selection of the best contractor and by using those criteria comparative study of different contractor selection methods has been done. Here I have used Analytical hierarchy process (AHP), TOPSIS (Technique for Order Preference by Similarity to an Ideal Solution) and Weighted Score Method (WSM) for the selection of a contractor among the bidders and those methods were compared. It is observed from the comparative study that the contractor who is having more weightage for the criteria which is having more weightage is selected as the best contractor and it is also observed that the contractor who is having more weightage for quality performance is selected as best.

[1]  Thomas L. Saaty,et al.  Decision-making with the AHP: Why is the principal eigenvector necessary , 2003, Eur. J. Oper. Res..

[2]  Kamal M. Al‐Subhi Al‐Harbi,et al.  Application of the AHP in project management , 2001 .

[3]  Chen-Fu Chien,et al.  An AHP-based approach to ERP system selection , 2005 .

[4]  Evangelos Triantaphyllou,et al.  USING THE ANALYTIC HIERARCHY PROCESS FOR DECISION MAKING IN ENGINEERING APPLICATIONS: SOME CHALLENGES , 1995 .

[5]  Majid Mojahed,et al.  Using engineering Economy techniques with group topsis method for best project selection , 2009, 2009 2nd IEEE International Conference on Computer Science and Information Technology.

[6]  Mohammad Izadikhah,et al.  An algorithmic method to extend TOPSIS for decision-making problems with interval data , 2006, Appl. Math. Comput..

[7]  Farzad Tahriri,et al.  AHP approach for supplier evaluation and selection in a steel manufacturing company , 2008 .

[9]  Nor Ashikin Mohamed Yusof,et al.  Analytical Hierarchy Process in Multiple Decisions Making for Higher Education in Malaysia , 2013 .

[10]  Thomas L. Saaty,et al.  DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .

[11]  Asad Asadzadeh,et al.  Assessing Site Selection of New Towns Using TOPSIS Method under Entropy Logic: A Case study: New Towns of Tehran Metropolitan Region (TMR) , 2014 .

[12]  San Cristobal,et al.  Contractor Selection Using Multicriteria Decision-Making Methods , 2012 .

[13]  Omid Jadidi,et al.  TOPSIS Method for Supplier Selection Problem , 2010 .

[14]  Majid Mojahed,et al.  Best Project Selection by Using of Group TOPSIS Method , 2009, 2009 International Association of Computer Science and Information Technology - Spring Conference.

[15]  Zohar J. Herbsman,et al.  MULTIPARAMETER BIDDING SYSTEM - INNOVATION IN CONTRACT ADMINISTRATION , 1992 .

[16]  Miroslaw J. Skibniewski,et al.  DECISION CRITERIA IN CONTRACTOR PREQUALIFICATION , 1988 .

[17]  Aviad Shapira,et al.  AHP-Based Equipment Selection Model for Construction Projects , 2005 .

[18]  Jamshid Shanbehzadeh,et al.  A MULTI-CRITERIA DECISION MAKING BASED METHOD FOR RANKING SEQUENTIAL PATTERNS , 2010 .

[19]  Majid Mojahed,et al.  Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran , 2010 .

[20]  Alireza Afshari,et al.  Simple Additive Weighting approach to Personnel Selection problem , 2010 .

[21]  T. Chakraborty,et al.  APPLICATION OF ANALYTIC HIERARCHY PROCESS AND HEURISTIC ALGORITHM IN SOLVING VENDOR SELECTION PROBLEM , 2011 .