A metric-based framework for sustainable production scheduling
暂无分享,去创建一个
Wei Li | I. S. Jawahir | Fazleena Badurdeen | Amin Abedini | I. S. Jawahir | Wei Li | F. Badurdeen | A. Abedini
[1] C. Romero,et al. Multiple Objectives in Agricultural Planning: A Compromise Programming Application , 1987 .
[2] Makoto Fujishima,et al. A study on energy efficiency improvement for machine tools , 2011 .
[3] Raymond Chiong,et al. Parallel Machine Scheduling Under Time-of-Use Electricity Prices: New Models and Optimization Approaches , 2016, IEEE Transactions on Automation Science and Engineering.
[4] I. S. Jawahir,et al. Sustainable manufacturing: Modeling and optimization challenges at the product, process and system levels , 2010 .
[5] Samuel Eilon,et al. Minimising Waiting Time Variance in the Single Machine Problem , 1977 .
[6] Massimo Paolucci,et al. Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops , 2012 .
[7] Adriana Giret,et al. Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm , 2013 .
[8] Wei Li,et al. An effective heuristic for no-wait flow shop production to minimize makespan , 2016 .
[9] Aihua Huang,et al. Metrics-based approach to evaluate sustainable manufacturing performance at the production line and plant levels , 2018, Journal of Cleaner Production.
[10] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[11] Axel Tuma,et al. Energy-efficient scheduling in manufacturing companies: A review and research framework , 2016, Eur. J. Oper. Res..
[12] Janet M. Twomey,et al. Operational methods for minimization of energy consumption of manufacturing equipment , 2007 .
[13] Bernd Scholz-Reiter,et al. A new method for autonomous control of complex job shops – Integrating order release, sequencing and capacity control to meet due dates , 2017 .
[14] Hülya Güçdemir,et al. Customer centric production planning and control in job shops: A simulation optimization approach ☆ , 2017 .
[15] Zeyi Sun,et al. Inventory control for peak electricity demand reduction of manufacturing systems considering the tradeoff between production loss and energy savings , 2014 .
[16] S. Afshin Mansouri,et al. Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption , 2016, Eur. J. Oper. Res..
[17] Cheng Wu,et al. Carbon-efficient scheduling of flow shops by multi-objective optimization , 2016, Eur. J. Oper. Res..
[18] Abid Ali Khan,et al. A research survey: review of flexible job shop scheduling techniques , 2016, Int. Trans. Oper. Res..
[19] Yong Wang,et al. Manufacturing profit maximization under time-varying electricity and labor pricing , 2017, Comput. Ind. Eng..
[20] Yong Yin,et al. Production planning of multi-stage multi-option seru production systems with sustainable measures , 2015 .
[21] Gang Li,et al. Single-machine due-window assignment scheduling based on common flow allowance, learning effect and resource allocation , 2015 .
[22] Chandrasekharan Rajendran,et al. Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date , 2001, Eur. J. Oper. Res..
[23] Qiong Liu,et al. A hybrid fruit fly algorithm for solving flexible job-shop scheduling to reduce manufacturing carbon footprint , 2017 .
[24] Takashi Irohara,et al. Scheduling for sustainable manufacturing: A review , 2018, Journal of Cleaner Production.
[25] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[26] H. Wee,et al. Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission , 2018, Journal of Cleaner Production.
[27] I. S. Jawahir,et al. Technological Elements of Circular Economy and the Principles of 6R-Based Closed-loop Material Flow in Sustainable Manufacturing , 2016 .
[28] Quan-Ke Pan,et al. Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm , 2017 .
[29] Toon De Pessemier,et al. An Energy-Cost-Aware Scheduling Methodology for Sustainable Manufacturing☆ , 2015 .
[30] Joseph Y.-T. Leung,et al. Parallel machine scheduling problems in green manufacturing industry , 2016 .
[31] Suresh P. Sethi,et al. Earliness-Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date , 1991, Oper. Res..
[32] Lin Li,et al. A multi-level optimization approach for energy-efficient flexible flow shop scheduling , 2016 .
[33] Prabuddha De,et al. On the Minimization of Completion Time Variance with a Bicriteria Extension , 1992, Oper. Res..
[34] Mark Voorneveld,et al. Characterization of Pareto dominance , 2003, Oper. Res. Lett..
[35] Fawaz S. Al-Anzi,et al. An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time , 2013 .
[36] John J. Kanet,et al. Minimizing Variation of Flow Time in Single Machine Systems , 1981 .
[37] Keisuke Nagasawa,et al. Robust flow shop scheduling with random processing times for reduction of peak power consumption , 2015, Simul. Model. Pract. Theory.
[38] Dawei Zhang,et al. The Relationship between Maximum Completion Time and Total Completion Time in Flowshop Production , 2015 .
[39] Joaquín B. Ordieres Meré,et al. Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .
[40] Damien Trentesaux,et al. Sustainability in manufacturing operations scheduling: A state of the art review , 2015 .
[41] Marc E. Posner,et al. Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date , 1991, Oper. Res..
[42] Duc Truong Pham,et al. Perception data-driven optimization of manufacturing equipment service scheduling in sustainable manufacturing , 2016 .
[43] Wei Li,et al. An improved heuristic for no-wait flow shop to minimize makespan , 2017 .
[44] Rainer Leisten,et al. Variability of completion time differences in permutation flow shop scheduling , 2015, Comput. Oper. Res..
[45] Uttarayan Bagchi,et al. Simultaneous Minimization of Mean and Variation of Flow Time and Waiting Time in Single Machine Systems , 1989, Oper. Res..
[46] Nasser Shahsavari-Pour,et al. A novel hybrid meta-heuristic algorithm for solving multi objective flexible job shop scheduling , 2013 .
[47] George Q. Huang,et al. Hybrid flow shop scheduling considering machine electricity consumption cost , 2013 .
[48] Tao Wu,et al. An energy-responsive optimization method for machine tool selection and operation sequence in flexible machining job shops , 2015 .
[49] Jung Woo Jung,et al. Flowshop-scheduling problems with makespan criterion: a review , 2005 .
[50] John W. Sutherland,et al. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction , 2011 .
[51] Guo-Sheng Liu,et al. Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time , 2017 .
[52] Mohammad Yavari,et al. Integrated decision making for parts ordering and scheduling of jobs on two-stage assembly problem in three level supply chain , 2018 .
[53] Wei Li,et al. Trade-off balancing in scheduling for flow shop production and perioperative processes , 2019, Eur. J. Oper. Res..
[54] John Elkington,et al. Partnerships from cannibals with forks: The triple bottom line of 21st‐century business , 1998 .
[55] Reimund Neugebauer,et al. Structure principles of energy efficient machine tools , 2011 .
[56] Amin Abedini,et al. An effective and efficient heuristic for no-wait flow shop production to minimize total completion time , 2017, Comput. Ind. Eng..
[57] I. S. Jawahir,et al. Innovation in sustainable manufacturing education , 2013 .
[58] Fazleena Badurdeen,et al. Sustainable Value Creation in Manufacturing at Product and Process Levels: A Metrics-Based Evaluation , 2014 .
[59] Yuan-Yuan Lu,et al. No-wait two-machine permutation flow shop scheduling problem with learning effect, common due date and controllable job processing times , 2018, Int. J. Prod. Res..
[60] Wieslaw Kubiak,et al. Completion time variance minimization on a single machine is difficult , 1993, Oper. Res. Lett..
[61] Marlies Van der Wee,et al. Energy- and Labor-aware Production Scheduling for Sustainable Manufacturing: A Case Study on Plastic Bottle Manufacturing , 2017 .
[62] Jose M. Framiñan,et al. A review and classification of heuristics for permutation flow-shop scheduling with makespan objective , 2004, J. Oper. Res. Soc..
[63] Ada Che,et al. Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs , 2017 .
[64] Behdin Vahedi-Nouri,et al. Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints , 2013 .
[65] Christoph Herrmann,et al. An Investigation into Fixed Energy Consumption of Machine Tools , 2011 .
[66] Jin Wang,et al. Game theory based real-time multi-objective flexible job shop scheduling considering environmental impact , 2017 .
[67] Pierre Lopez,et al. The energy scheduling problem: Industrial case-study and constraint propagation techniques , 2013 .
[68] I. Shafarevich,et al. Linear Algebra and Geometry , 2012 .
[69] Renzo Akkerman,et al. Water-integrated scheduling of batch process plants: Modelling approach and application in technology selection , 2018, Eur. J. Oper. Res..