Evolutionary techniques for optimization problems in integrated manufacturing system: State-of-the-art-survey
暂无分享,去创建一个
Mitsuo Gen | Lin Lin | Haipeng Zhang | M. Gen | Lin Lin | Haipeng Zhang
[1] T. Koopmans,et al. Assignment Problems and the Location of Economic Activities , 1957 .
[2] B. Whitehead,et al. The planning of single-storey layouts , 1965 .
[3] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[4] Inyong Ham,et al. Computer-Aided Process Planning: The Present and the Future , 1988 .
[5] Iris D. Tommelein,et al. Site‐Layout Modeling: How Can Artificial Intelligence Help? , 1992 .
[6] Paolo Brandimarte,et al. Routing and scheduling in a flexible job shop by tabu search , 1993, Ann. Oper. Res..
[7] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[8] Mitsuo Gen,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms—I: representation , 1996 .
[9] Xiaolan Xie,et al. Optimization of the number of transportation devices in a flexible manufacturing system using event graphs , 1997, IEEE Trans. Ind. Electron..
[10] Stéphane Dauzère-Pérès,et al. An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search , 1997, Ann. Oper. Res..
[11] Mitsuo Gen,et al. Loop layout design problem in flexible manufacturing systems using genetic algorithms , 1998 .
[12] B. Beamon. Supply chain design and analysis:: Models and methods , 1998 .
[13] R. Kolisch,et al. Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints , 2000 .
[14] Hark Hwang,et al. Determination of unit load sizes of AGV in multi-product multi-line assembly production systems , 1999 .
[15] Hark Hwang,et al. An adaptive dispatching algorithm for automated guided vehicles based on an evolutionary process , 1999 .
[16] Yasuhiro Tsujimura,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies , 1999 .
[17] Mitsuo Gen,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms: Part II. Hybrid , 1999 .
[18] W. E. I. Ta N,et al. Integration of process planning and schedulingÐ a review , 2000 .
[19] Nicolas Jonard,et al. A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs , 2000 .
[20] Jian-Bo Yang,et al. GA-based discrete dynamic programming approach for scheduling in FMS environments , 2001, IEEE Trans. Syst. Man Cybern. Part B.
[21] Ling Qiu,et al. Scheduling and routing algorithms for AGVs: A survey , 2002 .
[22] Pierre Borne,et al. Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic , 2002, Math. Comput. Simul..
[23] Mitsuo Gen,et al. An integrated model for the design of end-of-aisle order picking system and the determination of unit load sizes of AGVs , 2002 .
[24] Pierre Borne,et al. Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems , 2002, IEEE Trans. Syst. Man Cybern. Part C.
[25] Andrew Y. C. Nee,et al. Hybrid genetic algorithm and simulated annealing approach for the optimization of process plans for prismatic parts , 2002 .
[26] Yunfeng Zhang,et al. Process planning optimization for the manufacture of injection moulds using a genetic algorithm , 2003, Int. J. Comput. Integr. Manuf..
[27] Ivan Tanev,et al. Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: application service provider approach , 2004, Appl. Soft Comput..
[28] Mitsuo Gen,et al. Evolutionary Algorithm for Process Plan Selection with Multiple Objectives , 2004 .
[29] Christian Hicks,et al. A genetic algorithm tool for designing manufacturing facilities in the capital goods industry , 2004 .
[30] C. Moon *,et al. Advanced planning and scheduling based on precedence and resource constraints for e-plant chains , 2004 .
[31] David Naso,et al. Multicriteria meta-heuristics for AGV dispatching control based on computational intelligence , 2005, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).
[32] Kyu-Yeul Lee,et al. An improved genetic algorithm for multi-floor facility layout problems having inner structure walls and passages , 2005, Comput. Oper. Res..
[33] Yoonho Seo,et al. Evolutionary algorithm for advanced process planning and scheduling in a multi-plant , 2005, Comput. Ind. Eng..
[34] Andrew Y. C. Nee,et al. Application of genetic algorithm to computer-aided process planning in distributed manufacturing environments , 2005 .
[35] Zhiming Wu,et al. An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems , 2005, Comput. Ind. Eng..
[36] Mitsuo Gen,et al. Effective Designing Chromosome for Optimizing Advanced Planning and Scheduling , 2006 .
[37] Eduardo Vila Gonçalves Filho,et al. A group genetic algorithm for the machine cell formation problem , 2006 .
[38] M. Koster,et al. A Review Of Design And Control Of Automated Guided Vehicle Systems , 2004 .
[39] Iris F. A. Vis,et al. Survey of research in the design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..
[40] Hark Hwang,et al. Network model and effective evolutionary approach for AGV dispatching in manufacturing system , 2006, J. Intell. Manuf..
[41] Mitsuo Gen,et al. Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm , 2006, J. Intell. Manuf..
[42] Mitsuo Gen,et al. An effective coding approach for multiobjective integrated resource selection and operation sequences problem , 2006, J. Intell. Manuf..
[43] Seung-Kil Lim,et al. Advanced Planning and Scheduling (APS) System Implementation for Semiconductor Manufacturing : A Case at Korean Semiconductor Manufacturing Company , 2007 .
[44] Cihan H. Dagli. Intelligent Engineering Systems through Artificial Neural Networks Volume 18 , 2008 .
[45] Mitsuo Gen,et al. Multistage-Based Genetic Algorithm for Flexible Job-Shop Scheduling Problem , 2009 .