Evolutionary techniques for optimization problems in integrated manufacturing system: State-of-the-art-survey

[1]  T. Koopmans,et al.  Assignment Problems and the Location of Economic Activities , 1957 .

[2]  B. Whitehead,et al.  The planning of single-storey layouts , 1965 .

[3]  Ravi Sethi,et al.  The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..

[4]  Inyong Ham,et al.  Computer-Aided Process Planning: The Present and the Future , 1988 .

[5]  Iris D. Tommelein,et al.  Site‐Layout Modeling: How Can Artificial Intelligence Help? , 1992 .

[6]  Paolo Brandimarte,et al.  Routing and scheduling in a flexible job shop by tabu search , 1993, Ann. Oper. Res..

[7]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[8]  Mitsuo Gen,et al.  A tutorial survey of job-shop scheduling problems using genetic algorithms—I: representation , 1996 .

[9]  Xiaolan Xie,et al.  Optimization of the number of transportation devices in a flexible manufacturing system using event graphs , 1997, IEEE Trans. Ind. Electron..

[10]  Stéphane Dauzère-Pérès,et al.  An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search , 1997, Ann. Oper. Res..

[11]  Mitsuo Gen,et al.  Loop layout design problem in flexible manufacturing systems using genetic algorithms , 1998 .

[12]  B. Beamon Supply chain design and analysis:: Models and methods , 1998 .

[13]  R. Kolisch,et al.  Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints , 2000 .

[14]  Hark Hwang,et al.  Determination of unit load sizes of AGV in multi-product multi-line assembly production systems , 1999 .

[15]  Hark Hwang,et al.  An adaptive dispatching algorithm for automated guided vehicles based on an evolutionary process , 1999 .

[16]  Yasuhiro Tsujimura,et al.  A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies , 1999 .

[17]  Mitsuo Gen,et al.  A tutorial survey of job-shop scheduling problems using genetic algorithms: Part II. Hybrid , 1999 .

[18]  W. E. I. Ta N,et al.  Integration of process planning and schedulingÐ a review , 2000 .

[19]  Nicolas Jonard,et al.  A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs , 2000 .

[20]  Jian-Bo Yang,et al.  GA-based discrete dynamic programming approach for scheduling in FMS environments , 2001, IEEE Trans. Syst. Man Cybern. Part B.

[21]  Ling Qiu,et al.  Scheduling and routing algorithms for AGVs: A survey , 2002 .

[22]  Pierre Borne,et al.  Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic , 2002, Math. Comput. Simul..

[23]  Mitsuo Gen,et al.  An integrated model for the design of end-of-aisle order picking system and the determination of unit load sizes of AGVs , 2002 .

[24]  Pierre Borne,et al.  Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems , 2002, IEEE Trans. Syst. Man Cybern. Part C.

[25]  Andrew Y. C. Nee,et al.  Hybrid genetic algorithm and simulated annealing approach for the optimization of process plans for prismatic parts , 2002 .

[26]  Yunfeng Zhang,et al.  Process planning optimization for the manufacture of injection moulds using a genetic algorithm , 2003, Int. J. Comput. Integr. Manuf..

[27]  Ivan Tanev,et al.  Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: application service provider approach , 2004, Appl. Soft Comput..

[28]  Mitsuo Gen,et al.  Evolutionary Algorithm for Process Plan Selection with Multiple Objectives , 2004 .

[29]  Christian Hicks,et al.  A genetic algorithm tool for designing manufacturing facilities in the capital goods industry , 2004 .

[30]  C. Moon *,et al.  Advanced planning and scheduling based on precedence and resource constraints for e-plant chains , 2004 .

[31]  David Naso,et al.  Multicriteria meta-heuristics for AGV dispatching control based on computational intelligence , 2005, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).

[32]  Kyu-Yeul Lee,et al.  An improved genetic algorithm for multi-floor facility layout problems having inner structure walls and passages , 2005, Comput. Oper. Res..

[33]  Yoonho Seo,et al.  Evolutionary algorithm for advanced process planning and scheduling in a multi-plant , 2005, Comput. Ind. Eng..

[34]  Andrew Y. C. Nee,et al.  Application of genetic algorithm to computer-aided process planning in distributed manufacturing environments , 2005 .

[35]  Zhiming Wu,et al.  An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems , 2005, Comput. Ind. Eng..

[36]  Mitsuo Gen,et al.  Effective Designing Chromosome for Optimizing Advanced Planning and Scheduling , 2006 .

[37]  Eduardo Vila Gonçalves Filho,et al.  A group genetic algorithm for the machine cell formation problem , 2006 .

[38]  M. Koster,et al.  A Review Of Design And Control Of Automated Guided Vehicle Systems , 2004 .

[39]  Iris F. A. Vis,et al.  Survey of research in the design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..

[40]  Hark Hwang,et al.  Network model and effective evolutionary approach for AGV dispatching in manufacturing system , 2006, J. Intell. Manuf..

[41]  Mitsuo Gen,et al.  Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm , 2006, J. Intell. Manuf..

[42]  Mitsuo Gen,et al.  An effective coding approach for multiobjective integrated resource selection and operation sequences problem , 2006, J. Intell. Manuf..

[43]  Seung-Kil Lim,et al.  Advanced Planning and Scheduling (APS) System Implementation for Semiconductor Manufacturing : A Case at Korean Semiconductor Manufacturing Company , 2007 .

[44]  Cihan H. Dagli Intelligent Engineering Systems through Artificial Neural Networks Volume 18 , 2008 .

[45]  Mitsuo Gen,et al.  Multistage-Based Genetic Algorithm for Flexible Job-Shop Scheduling Problem , 2009 .