Time Driven Activity Based Costing : Theory,Applications and Limitations
暂无分享,去创建一个
[1] Alexandra Van den Abbeele,et al. Time-Driven Activity-Based Costing for Inter-Library Services: A Case Study in a University , 2007 .
[2] Zohreh Hajiha,et al. IMPLEMENTATION OF TIME-DRIVEN ACTIVITY-BASED COSTING SYSTEM AND CUSTOMER PROFITABILITY ANALYSIS IN THE HOSPITALITY INDUSTRY: EVIDENCE FROM IRAN , 2011 .
[3] Werner Bruggeman,et al. Sanac Inc.: From ABC to time-driven ABC (TDABC) – An instructional case , 2008 .
[4] Werner Bruggeman,et al. Time-driven activity-based costing: exploring the underlying model , 2007 .
[5] Robert S. Kaplan,et al. Time-Driven Activity-Based Costing: A Simpler and More Powerful Path to Higher Profits , 2007 .
[6] Malcolm Smith,et al. Research Methods in Accounting , 2003 .
[7] Joos Vandewalle,et al. Recent Evolutions in Costing Systems: A Literature Review of Time-Driven Activity-Based Costing , 2013 .
[8] R. Kaplan,et al. Time-driven activity-based costing. , 2003, Harvard business review.
[9] Mustafa Özbayrak,et al. Activity-based cost estimation in a push/pull advanced manufacturing system , 2004 .
[10] Vijay Govindarajan,et al. Strategic Cost Management , 1993 .
[11] Figen Öker,et al. A New Costing Model in Hospital Management: Time-Driven Activity-Based Costing System , 2013, The health care manager.
[12] Michael Burkert,et al. Traditional ABC and Time-Driven ABC: An Experimental Investigation , 2013 .
[13] Christopher D. Ittner,et al. Activity-based costing concepts for quality improvement , 1999 .
[14] Michel Gervais,et al. Time-Driven Activity-Based Costing (TDABC): An Initial Appraisal through a Longitudinal Case Study , 2009 .
[15] David E. Stout,et al. Implementing Time-Driven Activity-Based Costing at a Medium-Sized Electronics Company , 2011 .
[16] Mehdi Alinezhad Sarokolaei,et al. Time Driven Activity based Costing by Using Fuzzy Logics , 2013 .
[17] Wout Dullaert,et al. The development of time driven activity-based costing models : a case study in a road transport and logistics company , 2011 .
[18] Robert S. Kaplan,et al. The innovation of time-driven activity-based costing , 2007 .
[19] A. Madhok,et al. Understanding alliance evolution and termination: Adjustment costs and the economics of resource value , 2015 .
[20] K. Chamie,et al. Measuring the cost of care in benign prostatic hyperplasia using time-driven activity-based costing (TDABC). , 2015, Healthcare.
[21] Veyis Naci Tanis,et al. Customer profitability analysis with time‐driven activity‐based costing: a case study in a hotel , 2010 .
[22] Werner Bruggeman,et al. Identifying operational improvements during the design process of a time-driven ABC system: The role of collective worker participation and leadership style , 2010 .
[23] Wout Dullaert,et al. Time driven activity-based costing in a small road transport and logistics company , 2010 .
[24] Naomi S. Soderstrom,et al. Are overhead costs strictly proportional to activity? : Evidence from hospital departments , 1994 .
[25] Azende Terungwa. Practicability of Time-driven Activity-based Costing on Profitability of Restaurants in Makurdi Metropolis of Benue State, Nigeria , 2012 .
[26] Werner Bruggeman,et al. Cost modeling in logistics using time‐driven ABC: Experiences from a wholesaler , 2008 .
[27] Michael W. Maher,et al. A field study on the limitations of activity-based costing when resources are provided on a joint and indivisible basis , 1998 .
[28] Karla Z. Bertrand,et al. A time-driven activity-based costing model to improve health-care resource use in Mirebalais, Haiti , 2015, The Lancet.
[29] Janek Ratnatunga,et al. Cost Management in Sri Lanka: A Case Study on Volume, Activity and Time as Cost Drivers , 2012 .
[30] Janek Ratnatunga,et al. Transparent Costing: Has the emperor got clothes? , 2010 .
[31] Carsten Homburg,et al. Using relative profits as an alternative to activity-based costing , 2005 .
[32] Hein S. Venter,et al. Using time-driven activity-based costing to manage digital forensic readiness in large organisations , 2011, Information Systems Frontiers.
[33] Wout Dullaert,et al. Unlocking the potential of time-driven activity-based costing for small logistics companies , 2012 .
[34] Michael S. C. Tse,et al. Recognition of Idle Resources in Time-Driven Activity-Based Costing and Resource Consumption Accounting Models , 2009 .
[35] Xiao-dan Wu,et al. Modeling and error analysis of Time-Driven Activity-Based Costing , 2011, 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management.
[36] Filip Roodhooft,et al. Time-driven activity-based costing in an outpatient clinic environment: development, relevance and managerial impact. , 2009, Health policy.
[37] Carlos Rodríguez Monroy,et al. Activity Based Costing, Time-Driven Activity Based Costing and Lean Accounting: Differences among three accounting systems' approach to manufacturing , 2014 .
[38] Robert S. Kaplan,et al. Advanced Management Accounting , 1989 .
[39] Filip Roodhooft,et al. Time-driven activity-based costing for a library acquisition process: A case study in a Belgian University , 2010 .
[40] Joos Vandewalle,et al. Using Time-Driven Activity-Based Costing to Support Library Management Decisions: A Case Study for Lending and Returning Processes , 2014, The Library Quarterly.
[41] Nitza Geri,et al. Relevance lost: the rise and fall of activity-based costing , 2005 .
[42] Raul Valverde,et al. Time-Driven Activity Based Costing for the Improvement of IT Service Operations , 2013 .