Time Driven Activity Based Costing : Theory,Applications and Limitations

The aim of this study is to explore the strategic applications and limitations of Time-driven Activity-based Costing (TDABC) and to evaluate the degree of accuracy of the proponents’ arguments concerning its usefulness. In this study, published works directly related to this area from the period 2004-2015 are analyzed. This study reports TDABC's applications in strategic areas such as cost of production, unused capacity, price determination, customer profitability analysis, and modeling complex decisions in various small, medium, and large private, governmental, and nonprofit service and manufacturing organizations. However, since they are not based on any concrete empirical investigations, only future empirical studies can authentically reveal the advantages of this technique. TDABC also severely suffers from the following spheres: it lacks the ability to identify activities in the first implementation step, such as practical capacity costs rate, uniform capacity costs rate, managers’ time estimation for each activity, determination of unused capacity, as well as lack of data accuracy, and limitations of managerial decision makings. As a result of these drawbacks, proponents’ arguments regarding TDABC’s usefulness and its widespread applications -in the future and around the world- are baseless.

[1]  Alexandra Van den Abbeele,et al.  Time-Driven Activity-Based Costing for Inter-Library Services: A Case Study in a University , 2007 .

[2]  Zohreh Hajiha,et al.  IMPLEMENTATION OF TIME-DRIVEN ACTIVITY-BASED COSTING SYSTEM AND CUSTOMER PROFITABILITY ANALYSIS IN THE HOSPITALITY INDUSTRY: EVIDENCE FROM IRAN , 2011 .

[3]  Werner Bruggeman,et al.  Sanac Inc.: From ABC to time-driven ABC (TDABC) – An instructional case , 2008 .

[4]  Werner Bruggeman,et al.  Time-driven activity-based costing: exploring the underlying model , 2007 .

[5]  Robert S. Kaplan,et al.  Time-Driven Activity-Based Costing: A Simpler and More Powerful Path to Higher Profits , 2007 .

[6]  Malcolm Smith,et al.  Research Methods in Accounting , 2003 .

[7]  Joos Vandewalle,et al.  Recent Evolutions in Costing Systems: A Literature Review of Time-Driven Activity-Based Costing , 2013 .

[8]  R. Kaplan,et al.  Time-driven activity-based costing. , 2003, Harvard business review.

[9]  Mustafa Özbayrak,et al.  Activity-based cost estimation in a push/pull advanced manufacturing system , 2004 .

[10]  Vijay Govindarajan,et al.  Strategic Cost Management , 1993 .

[11]  Figen Öker,et al.  A New Costing Model in Hospital Management: Time-Driven Activity-Based Costing System , 2013, The health care manager.

[12]  Michael Burkert,et al.  Traditional ABC and Time-Driven ABC: An Experimental Investigation , 2013 .

[13]  Christopher D. Ittner,et al.  Activity-based costing concepts for quality improvement , 1999 .

[14]  Michel Gervais,et al.  Time-Driven Activity-Based Costing (TDABC): An Initial Appraisal through a Longitudinal Case Study , 2009 .

[15]  David E. Stout,et al.  Implementing Time-Driven Activity-Based Costing at a Medium-Sized Electronics Company , 2011 .

[16]  Mehdi Alinezhad Sarokolaei,et al.  Time Driven Activity based Costing by Using Fuzzy Logics , 2013 .

[17]  Wout Dullaert,et al.  The development of time driven activity-based costing models : a case study in a road transport and logistics company , 2011 .

[18]  Robert S. Kaplan,et al.  The innovation of time-driven activity-based costing , 2007 .

[19]  A. Madhok,et al.  Understanding alliance evolution and termination: Adjustment costs and the economics of resource value , 2015 .

[20]  K. Chamie,et al.  Measuring the cost of care in benign prostatic hyperplasia using time-driven activity-based costing (TDABC). , 2015, Healthcare.

[21]  Veyis Naci Tanis,et al.  Customer profitability analysis with time‐driven activity‐based costing: a case study in a hotel , 2010 .

[22]  Werner Bruggeman,et al.  Identifying operational improvements during the design process of a time-driven ABC system: The role of collective worker participation and leadership style , 2010 .

[23]  Wout Dullaert,et al.  Time driven activity-based costing in a small road transport and logistics company , 2010 .

[24]  Naomi S. Soderstrom,et al.  Are overhead costs strictly proportional to activity? : Evidence from hospital departments , 1994 .

[25]  Azende Terungwa Practicability of Time-driven Activity-based Costing on Profitability of Restaurants in Makurdi Metropolis of Benue State, Nigeria , 2012 .

[26]  Werner Bruggeman,et al.  Cost modeling in logistics using time‐driven ABC: Experiences from a wholesaler , 2008 .

[27]  Michael W. Maher,et al.  A field study on the limitations of activity-based costing when resources are provided on a joint and indivisible basis , 1998 .

[28]  Karla Z. Bertrand,et al.  A time-driven activity-based costing model to improve health-care resource use in Mirebalais, Haiti , 2015, The Lancet.

[29]  Janek Ratnatunga,et al.  Cost Management in Sri Lanka: A Case Study on Volume, Activity and Time as Cost Drivers , 2012 .

[30]  Janek Ratnatunga,et al.  Transparent Costing: Has the emperor got clothes? , 2010 .

[31]  Carsten Homburg,et al.  Using relative profits as an alternative to activity-based costing , 2005 .

[32]  Hein S. Venter,et al.  Using time-driven activity-based costing to manage digital forensic readiness in large organisations , 2011, Information Systems Frontiers.

[33]  Wout Dullaert,et al.  Unlocking the potential of time-driven activity-based costing for small logistics companies , 2012 .

[34]  Michael S. C. Tse,et al.  Recognition of Idle Resources in Time-Driven Activity-Based Costing and Resource Consumption Accounting Models , 2009 .

[35]  Xiao-dan Wu,et al.  Modeling and error analysis of Time-Driven Activity-Based Costing , 2011, 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management.

[36]  Filip Roodhooft,et al.  Time-driven activity-based costing in an outpatient clinic environment: development, relevance and managerial impact. , 2009, Health policy.

[37]  Carlos Rodríguez Monroy,et al.  Activity Based Costing, Time-Driven Activity Based Costing and Lean Accounting: Differences among three accounting systems' approach to manufacturing , 2014 .

[38]  Robert S. Kaplan,et al.  Advanced Management Accounting , 1989 .

[39]  Filip Roodhooft,et al.  Time-driven activity-based costing for a library acquisition process: A case study in a Belgian University , 2010 .

[40]  Joos Vandewalle,et al.  Using Time-Driven Activity-Based Costing to Support Library Management Decisions: A Case Study for Lending and Returning Processes , 2014, The Library Quarterly.

[41]  Nitza Geri,et al.  Relevance lost: the rise and fall of activity-based costing , 2005 .

[42]  Raul Valverde,et al.  Time-Driven Activity Based Costing for the Improvement of IT Service Operations , 2013 .